EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 29, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in San Francisco, California. Completed plans call for site work for a water / sewer project.

For more information, contact the Project Manager, Simon Betsalel (415-609-8549) or Kathryn Purcell (415-518-0484) constructionbids@sfport.com. Time Allowed for Completion: 365 consecutive calendar days Liquidated Damages: Varies, refer to Section 00 73 02 for details Contract Monitoring Division Local Business Enterprise (LBE) Subcontracting Requirement: LBE = 5% The LBE subcontracting requirement is 5% and can only be met with San Francisco CMD-Certified Small and/or Micro-LBEs. The LBE subcontracting requirement is less than 20% due to the nature of work which include marine dredging, transport and disposal of marine debris by barge, remediation and stabilization of bay floor in the dredged area. 2.00% MBE; 1.00% WBE; 2.00% OBE; Bid security in the form of a corporate surety bond or an irrevocable letter of credit (or certified check if required bid security is $15,000 or less) for ten percent (10%) of the amount bid must accompany each bid. For information on the Citys Surety Bond Program, call Jennifer Elmore at (415) 217-6578. Pre-bid meeting notes : Dial in by phone +1 415-906-4659,,675849904# United States, San Francisco Find a local number Phone conference ID: 675 849 904# bid open notes : Dial in by phone +1 415-906-4659,,637818121# United States, San Francisco Find a local number Phone conference ID: 637 818 121# The Port reserves the right to reject any or all bids and waive any minor irregularities in any bid.

GC Bidding

Water / Sewer

$8,500,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction, Operation and Maintenance of Waterway and Marine Construction, Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
117
Bidding Soon
1,925
All Active Projects
928
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

July 1, 2025

img_map_placeholder

Mission Bay Boulevard South, San Francisco, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mission Bay Ferry Landing Phase 2A - Marine Demolition and Mattress

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.