BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Site work for a water / sewer project in Crookston, Minnesota. Completed plans call for site work for a water / sewer project.

Streambank Stabilization site is located on the Red Lake River approximately 9 miles southwest of the City of Red Lake Falls in Section 33, Louisville Township, Red Lake County, Minnesota. Site to be constructed using bioengineering (toe-wood/sod mat) and reshaping of existing riprap stream barbs at/below the bank full height. The remaining slope above the bank full height is proposed to be excavated at a 4H:1V slope with a spoil bank placed outside the floodplain. Est. Completion Date: Oct. 31, 2025 Question deadline - 3 April 2025

Award

Water / Sewer

$253,759.00

Public - City

Site Work

24

12

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
14
Bidding Soon
232
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

June 16, 2025

Project location map

Multiple Locations, Crookston, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.