Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 11, 2025 at 7:00 PM
Updated November 12, 2025
Renovation of a residential development in Sulligent, Alabama. Completed plans call for the renovation of a residential development.
Each bid must be submitted in duplicate on forms furnished by the Architect and shall be sealed in an envelope. The bid must be accompanied by a certified check or bid bond in an amount not less than 5% of the Base Bid; the successful bidder will be required to furnish and pay for a satisfactory Performance Bond and a Payment Bond in the amount of 100% of the Contract. All bonds must be signed by an Alabama Resident or Resident Agent. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the contract documents must be paid on this project, and that the contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Each bid must include the Non-Collusive Affidavit, Representations, Certificates and Other Statements of Bidders and the Previous Participation Certificate signed by the bidder and on the correct HUD forms. All bidders are advised to ensure that the HUD Form 2530 is completely accurately, and each block completed. If the HUD Form 2530 is not correct, the contract award date will be delayed. Contractor shall be licensed in accordance with the State Laws. Proof of licensure will be required on the outside of the Bid Envelope before bid will be considered. Subcontractors whose contracts exceed $50,000, must also be licensed according to the State of Alabama Law and show proof thereof. Note: Bidders are advised that any misrepresentation of information contained in the bid packaged for previous work performed or negative information received by the Housing Authority concerning past work performance will be grounds for rejecting your bid proposal. Bids may be held by the Sulligent Housing Authority for a period not to exceed sixty (60) days from the date of opening of bids for the purpose of reviewing them and investigating the qualifications of the bidders, prior to awarding the contract. Any successful bidder who withdraws their bid for any reason within the 60 day period may forfeit the 5 percent bid bond. All other methods of bidding, except telegraphic modifications, will be considered non-responsive. No modifications on exterior of envelope without proper signature. NO EXCEPTIONS. The work will be in one Prime Contract. Bidders for this work shall have a "commercial contractor" license. All bid envelopes shall contain, on the exterior side, the Contractor's Certificate of Responsibility number. NO EXCEPTIONS. Award will be made to the lowest responsible and responsive bidder whose bid meets the requirements of this Invitation for Bids. The Housing Authority of the City of Sulligent, Sulligent, AL reserves the right to reject any and all bids or to waive any informalities in the bidding. Question Deadline Jul 31, 2025 Any prospective bidder desiring an explanation or interpretation ofthe solicitation, specifications, drawings, etc., must request it at least 7 days before the scheduled time for bid opening. Requests may be oral or written. Oral requests must be confirmed in writing.
Award
Residential Subdivision
$924,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 25, 2025
October 27, 2025
294 Bogue Ct, Sulligent, AL
Related To This Project
Sulligent, AL
Bid Date: May 01 2025
Sulligent, AL
Bid Date: Oct 01 2025
Sulligent, AL
Bid Date: Sep 26 2025
Sulligent, AL
--
Sulligent, AL
Bid Date: Aug 14 2025
Sulligent, AL
Bid Date: May 17 2024
Sulligent, AL
--
Sulligent, AL
Bid Date: Jan 18 2022
Sulligent, AL
Bid Date: Dec 01 2022
Cherokee, AL
Bid Date: Apr 30 2025
Sylacauga, AL
Bid Date: Apr 22 2025
Eclectic, AL
Bid Date: Apr 25 2025
Smiths Station, AL
Bid Date: Apr 10 2025
Tuscaloosa, AL
Bid Date: Apr 24 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
