BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2025 at 8:00 PM

Updated April 23, 2025

Site work and new construction of a transportation facility in Romeoville, Illinois. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

Joliet Regional Port District - Lewis University Airport Apron 200 Large Aircraft Storage Hangar Scope: New construction of a large aircraft storage hangar. Bid packages include: Plumbing, Electric, Precast Concrete, Painting, HVAC Steel, Fire Sprinklers, Concrete, Excavation, Roofing, Carpentry, Aluminum/Glazing, Hangar Doors, Floor Coating As of March 31, 2025, this project is currently bidding. A firm timeline for construction has not yet been established.

Post-Bid

Transportation Terminals

$500,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
440
Active Projects
248
Bidding Soon
3,236
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

June 30, 2025

Project location map

1 George J Michas Dr, Romeoville, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.