BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Site work and paving for a road / highway in Lincoln, Nebraska. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Signal Pole 70th St. and Nebraska Parkway Project Question Deadline 04/01/2025 at 2:00 PM CT These Special Provisions amend or supplement the City of Lincoln Standard Specifications for Municipal Construction, 2023 Edition, and the City of Lincoln Supplemental Specifications and Standard Plans for Municipal Construction. All provisions that are not so amened or supplemented via these special provisions remain in full force and effect. PROJECT TIE This project is tied with City of Lincoln Projects 706512, 706514, and 706530. In order to be eligible for award of this contract, bidders shall submit a completed bidding proposal for this project and City of Lincoln Project #706513. Award of the contracts, if awarded, will be based on the combined low bid for all contracts. Separate contracts will be awarded for each project CONTRACT TIME, MILESTONES, AND LIQUIDATED DAMAGES The Contractor shall have a total of forty-five days (45) consecutive calendar days from the Beginning of Work date to achieve Final Completion of this project. Final Completion is defined as all Work complete, and all lanes open to traffic. Final Completion shall be on or before December 15, 2025. CONSTRUCTION PHASING AND ACCESS Traffic Pole Installation at 70th and Nebraska Parkway may occur under lane closures. STORAGE/STAGING AREAS All staging of equipment and materials shall be within the limits of construction. If the Contractor will require additional space outside the street right-of-way for storage of equipment and material during the duration of the project, then the Contractor, at their expense, shall be responsible to secure temporary property rights from the adjacent property owners and shall provide a copy of the agreement(s) to the City's Project Manager. STATUS OF UTILITIES The Contractor should request a utility status update at the project pre-construction conference, and/or prior to starting work. The Contractor shall coordinate all construction activities with affected utilities. CITY CONTACTS LTU/Traffic Engineering, Signals - The City of Lincoln has existing conduits, pull boxes, street lighting, traffic signal, traffic signal detector loops and associated elements within the project limits. Coordination with the City's Project Manager and the City of Lincoln Traffic Engineering staff will be required for when any work is impacting or in the proximity of any traffic signal element. The Contractor shall notify the City's Project Manager and Traffic Engineering a minimum of five (5) working days prior to the start of any work that would be in the proximity or directly impact any part of these facilities. Contact: Jarred Whitsell Phone: 402.417.3173 LTU/Traffic Engineering, Pavement Markings & Signs - The City of Lincoln has existing markings and signs within the project limits that will be impacted. Coordination with the City's Project Manager and the City of Lincoln Traffic Engineering staff will be required when markings and signs are to be replaced, relocated, or installed. Removal of existing markings and installation of proposed markings shall be completed by the Contractor. Removal or relocation of existing signs and installation of proposed signs shall be completed by the City of Lincoln Sign Shop. Contact: Michael Lammli Phone: 531.333.6702 LTU/Broadband - The City of Lincoln has internet broadband infrastructure located within the project limits. No conflicts or relocations are anticipated. Three new communication services to be coordinated per proposed design in contract documents. The Contractor shall notify the City's Project Manager and Broadband a minimum of five (5) working days prior to the start of any work that would be in the proximity or directly impact any part of these facilities. Contact: Greg Stohs Email: gstohs@lincoln.ne.gov Phone: 402.416.5147 STATUS OF PERMITS No permits are required.

Post-Bid

Roads / Highways

$15,000.00

Public - City

Paving, Site Work

5

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
89
Bidding Soon
865
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

May 9, 2025

Project location map

S 70th St & Nebraska Pkwy, Lincoln, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.