EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 27, 2025 at 8:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to a mixed-use development in Aurora, Illinois. Completed plans call for the addition of a educational facility; for the renovation of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

Bond Referendum 2024 The Board of Education for Indian Prairie School District 204 is soliciting Statements of Interest and Qualifications from qualified firms to provide comprehensive Construction Management At Risk Services to assist the District in the planning (pre-construction), bidding, construction, closeout and occupancy of the planned Master Facility Plan. Focus Area 1 - Comprehensive Renovation at Waubonsie Valley High School: Waubonsie Valley High School is approximately 590,000 square feet and has approximately 2,500 students. The scope for this school will be to renovate the entire school with a focus on improving learning environments, air quality, building systems, athletic complex, health/life safety, site upgrades, and energy efficiency. The estimated budget for these renovations is $130,000,000. Focus Area 2 - Comprehensive Renovation and Additions at Neuqua Valley High Schooland Repurposing Birkett Freshman Center: Neuqua Valley High School is approximately 450,000 square feet and has approximately 2,300 students currently. The scope for this school will be to renovate the entire school with a focus on improving learning environments, air quality, building systems, health/life safety, site upgrades, and energy efficiency. There will also be additions of approximately 49,000 square feet for expanded support space and additional classrooms to support bringing 800 freshman back to the school from the Birkett Center. The Birkett Center is approximately 140,000 square feet and will be repurposed and renovated to house the STEPS program, the credit recovery program, some CTE/STEM space and professional development spaces. The estimated budget for these renovations and additions is $120,000,000. Focus Area 3 - Middle School Renovations: The focus of this effort will be at the seven middle schools with the majority of the renovations and additions to be completed at Gregory and Hill Middle School. Additional scope will include the secured vestibules and improvements at select elementary schools. This scope will be completed after Focus Areas 1 and 2 are completed or near completion. This RFQ is an invitation to provide Construction Management At-Risk Services for the District's Master Facility Plan; responses will be evaluated on the abilities, experience, and consultative services the firm can provide to the District on the implementation of this Plan that is further outlined in the Project Information section of this document. Question Deadline 03/27/2025 Any questions shall be submitted in writing to Mr. John Robinson via email at john_robinson@ipsd.org. Total Anticipated Duration of the Work: 8 years RFQ Submission: Submittals should be prepared as standard 8-1/2" x 11" letter size via PDF, and shall be limited to 50 pages, exclusive of required attachments. Front and back covers, table of contents pages and tabbed divider pages will not be counted if they do not contain submittal information. The information should be submitted in a double sided, readable, and/or bound in a book format. Electronic submissions should also be sent, but five (5) hard copies must be submitted. Timely delivery of submissions is the responsibility of the Respondent. There will be no public opening or reading of responses received by the School District pursuant to this request.

GC Bidding

Educational

$420,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
196
Bidding Soon
2,219
All Active Projects
1,085
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

March 23, 2026

img_map_placeholder

Multiple Locations, Aurora, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFQ CMAR - Indian Prairie CUSD 204 - Bond Referendum 2024

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.