BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2025 at 8:00 PM

Updated June 4, 2025

Site work and outdoor lighting for a transportation facility in Varney, West Virginia. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

** As of June 03, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Contract No. 1 - Install Navigational Aids Question Deadline 04/09/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than 7 days prior to the date for opening of Bids may not be answered. The scope of the project is to install new Precision Approach Path Indicators (PAPIs) and Runway End Identifier Lights (REILs) along and at the ends of Runway 8-26 at the Southern West Virginia Regional Airport located outside Varney, West Virginia. The installation consists of removing the existing PAPIs and REILs, restoration of any damaged wiring, etc. The project will also include mobilization and any other appurtenances required for a complete project detailed by the plans and specifications prepared by Chapman Technical Group. Construction Time Limits - The Contractor will be required to achieve Substantial Completion within 120 calendar days and final completion and readiness for final payment within 150 calendar days of the effective date of the Notice to Proceed. Liquidated damages will be $300.00 per day for each day after the expiration of the construction time. This project, due to the amount of federal participation, requires the Contractor to meet a goal for Disadvantaged Business Enterprise participation of 4.1 percent (4.1%). The Contractor will be required to justify the amount of DBE participation which will be utilized or that there was a good faith effort made to allow for DBE participation. It is the policy of the Authority that DBE's, as defined in 49 CFR Part 26, shall have the maximum opportunity to participate in the performance of contracts assisted in whole or part by funds granted by the DOT.

Bid Results

Transportation Terminals

$99,000.00

Public - County

Outdoor Lighting, Site Work

8

23

6

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
22
Bidding Soon
665
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

May 16, 2025

Project location map

To Be Determined, Varney, WV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.