Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 9, 2025 at 8:00 PM
Updated October 1, 2024
Renovation of a transportation facility in Wichita, Kansas. Completed plans call for the renovation of a transportation facility.
Airport - HVAC Equipment Replacement at 1801 Airport Road, 1761 Airport Road, & Airport Parking Garage The City of Wichita is seeking bids from firm(s) to provide HVAC Equipment Replacement for the Wichita Airport Authority Questions Due Date: Apr 2nd 2025, 5:00 PM CDT = Any questions may be submitted in writing to BRAD WARD, Midwest Engineering Incorporated (bward@meiks.com) The City of Wichita is the largest city in Kansas with a population of approximately 397,000 and is the seat of Sedgwick County. As of May 2024, the City's total land area was approximately 167 square miles. Major highways, including the Kansas Turnpike (I-35), Interstate 135 and U.S. 54 (Kellogg Avenue) link the City with a large trade area that encompasses a population of more than 1.1 million people within a 100-mile radius. The City of Wichita employs approximately 3,100 employees providing a full range of municipal services, including police and fire protection, parks and recreation programs, libraries, public housing, municipal transportation, airports, water and sewer utilities, general administration, and other services. Information regarding the City of Wichita can be found at wichita.gov. The legislative body of the City consists of a six-member City Council, elected by district, and a full time Mayor elected from the City-atlarge. The Council members and the Mayor serve four-year terms overlapping. The Council and Mayor establish general policies, which are executed by the City Manager. he General Requirements and Supplementary Conditions are part of this contract and govern work under this division. Temporary heating and air conditioning shall be the responsibility of the General Contractor. If the Contractor uses the permanent heating or air conditioning systems for temporary heating or air conditioning, extended warranties will be required on all equipment in use and replace filters in all units once a week. The extended warranties and filter replacement will need to cover the period between when the systems are turned on through Final Acceptance of the building. This shall include boilers, pumps, FPVAV's and AHU's, Etc. At the time of final inspection, if it is found that the interior of ductwork is dirty beyond normal standards, the ductwork systems shall be cleaned at the Contractor's expense. Work by Mechanical Contractor: Provide all mechanical systems indicated by the drawings, specified or as instructed otherwise. Unless specified otherwise, provide all labor, materials and equipment necessary to provide a complete and operational system. Work by Electrical Contractor: Provide all line voltage wiring and install items of equipment furnished by the Mechanical, such as thermostats, remote control panels, etc. Mechanical and Electrical Coordination: The Mechanical will provide to the Electrical all manufacturer's wiring diagrams and installation data and locate all equipment furnished to the Electrical. PID- A4001-B
Post-Bid
Transportation Terminals
$500,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 11, 2025
June 2, 2025
Multiple Locations, Wichita, KS
Related To This Project
Wichita, KS
Bid Date: Apr 29 2025
Wichita, KS
Bid Date: Jun 01 2025
Wichita, KS
Bid Date: Apr 15 2025
Wichita, KS
Bid Date: Apr 11 2025
Wichita, KS
Bid Date: Apr 11 2025
Wichita, KS
Bid Date: Apr 09 2025
Wichita, KS
Bid Date: Apr 11 2025
Wichita, KS
--
Wichita, KS
Bid Date: Apr 04 2025
Wichita, KS
Bid Date: Apr 04 2025
Wichita, KS
Bid Date: Mar 28 2025
Wichita, KS
Bid Date: Apr 11 2025
Wichita, KS
Bid Date: Apr 04 2025
Wichita, KS
Bid Date: Apr 04 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Cut Costs, Not Corners.
Get ahead of project risks by targeting the right work early. With detailed construction data at your fingertips, you can pursue jobs that match your margins—and walk away from those that don’t.
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.