Published May 8, 2025 at 8:00 PM

Updated May 9, 2025

Site work and paving for a mixed-use development in Effingham, Illinois. Completed plans call for site work for a development; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The proposed work is officially known as Santa Maria Avenue Extension for the City of Effingham, Effingham County, Illinois. The project shall consist of new pavement construction, watermain construction, sanitary sewer construction, storm sewer construction, sidewalk construction, and an alternate retention pond at the designated locations shown herein and other miscellaneous work. Proposals must be submitted to the City Clerks Office, and shall be enclosed in a separate and sealed envelope endorsed Santa Maria Avenue Extension. Each proposal shall contain the name of every person or firm interested in the same and shall be accompanied by a bid bond, bank cashiers check, bank draft or certified check for not less than five (5) percent of the amount of the bid. A surety bond for the full amount of the award is required. Failure on the part of the contractor to deliver the materials within the time specified or to do the work as specified herein will be considered just cause to forfeit the surety as provided in Article 108.10 of the State of Illinois Standard Specifications for Road and Bridge Construction, adopted January 1, 2022. The City of Effingham reserves the right to reject any or all bids, waive or not waive any informality in the bids, and to accept any bid which it deems most favorable to the City. It is agreed that this bid may not be withdrawn for a period of 45 days from opening thereof or it will be subject to forfeit the 5% Bid Bond provided with the bid. It is anticipated that a Notice of Award of a contract will be issued within 30-to-45 days of the date bids are received and that a Notice to Proceed will be issued within 10 days of the date of the Notice of Award if contractor provides proper insurance and bonding in a timely manner. Work on this project is subject to the Illinois Wages of Employees on Public Works Act 30 ILCS 570/ 1-7 is the Public Works Act (820 ILCS 130/1-12) This is the Prevailing Wage Act. Contractor shall not pay less than prevailing wages to all laborers, workman, and mechanics or any other trade performing work under this contract, and shall comply with the requirements of the act stated above. Prevailing Wages, as determined by the Illinois Department of Labor and the current prevailing wages in effect at the time of the work, as established by the City of Effingham. The submission of monthly certified payrolls to the City of Effingham will be required. Work on this project is subject to the Illinois Substance Abuse Prevention on Public Works Project Act as enacted by P.A. 95-0635. Completion- April 30, 2026

Award

Conservation and Development

$4,679,523.00

Public - City

Paving, Site Work

83

5

12

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
50
Bidding Soon
793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

Project location map

E Santa Maria Ave, Effingham, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.