Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 16, 2025 at 7:00 PM
Updated December 17, 2025
Demolition, site work, paving, outdoor lighting and new construction of a civil project in Orlando, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; and water / sewer project.
Project Description : MI-4 Project 2-SR 400 (I-4) From E Of CR532 to W of World Dr Complete reconstruction of the I-4 (S.R. 400) corridor from East of CR 532 to West of World Drive. The scope includes mainline reconstruction/widening, milling and resurfacing, modifications and tie-ins to interchange ramps, new bridge construction along Old Lake Wilson Rd., modifications to the existing bridge along Old Lake Wilson Rd., bridge replacements at Reedy Creek, new bridge construction at the S.R 429 interchange, noise wall construction, aesthetic treatment installation, drainage system construction, and signing, lighting and ITS upgrades. Contract Amount/Limit : $652,000,000.00 Project Manager : Keith Slater Public Meeting to Review and confirm responsive proposer list: 04/14/2025 Time: 4:00PM Posting Date of List of Qualified and Responsive Design-Build Firms: 04/14/2025 Interviews with Qualified and Responsive Design-Build Firms: 04/21/2025 Public Meeting Date to review and confirm evaluation scores and Determine intended award (selection) of Design-Build Firms: 05/05/2025 Time: 2:00PM Evaluation Scores and Selection Posting: 05/05/2025 Posting of the Evaluation Scores and Intended Award: 05/05/2025 Final Selection Posting Date: 05/08/2025 FL DOT - RFQ D/B - MI-4 Project 2-SR 400 (I-4) From E Of CR532 to W of World Dr
Post-Bid
Roads / Highways
$652,000,000.00
Public - State/Provincial
Demolition, New Construction, Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2025
January 12, 2026
I-4, Orlando, FL
Related To This Project
Orlando, FL
Bid Date: Apr 07 2025
Orlando, FL
--
Orlando, FL
Bid Date: Apr 01 2025
Orlando, FL
Bid Date: Jan 06 2026
Orlando, FL
--
Orlando, FL
--
Orlando, FL
--
Orlando, FL
--
Orlando, FL
Bid Date: Apr 22 2025
Orlando, FL
Bid Date: Apr 10 2025
Orlando, FL
--
Orlando, FL
Bid Date: Apr 17 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
