EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2025 at 8:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a mixed-use development in Portland, Maine. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; and water / sewer project.

Question Deadline 06/16/2025 at 12:00 PM ET Briefly and without force and effect upon the contract documents, the work of the contract can be summarized as follows: Supply, deliver and install precast architectural concrete; new vertical granite and curbing; metal railings; new hardscape plaza areas; exterior furnishings; landscape planting materials; exterior lighting poles and fixtures; underground and surface drainage systems; underground and surface electrical systems; storage facility and foundation. Contractor specifically agrees that all employment-related decisions (including but not limited to hiring, discharge, transfers, promotions, discipline, training, job opportunities, and wage and s alary levels) will be made without discrimination based on an individual’s race or color, religion, age, sex (including pregnancy), sexual orientation, gender identity or expression, ancestry or national origin, physical or mental disability, veteran status, genetic information, previous assertion of a claim or right under Maine’s Workers’ Compensation Act, previous actions taken protected under Maine’s Whistle blowers’ Protection Act, or any other protected group status as defined by applicable law. Provisions in applicable laws providing for bona fide occupational qualifications, business necessity, or age limitations will be adhered to by the Contractor where appropriate The successful bidder shall supply the City with a Performance Bond and Labor and Material Payment Bond, each in the amount of the contract price, guaranteeing one hundred percent (100%) performance of the contract, including the guarantee period and free and clear of any and all liens, attachments and encumbrances. All bonds shall comply with the requirements of Maine state law. A Bid Bond is not required The City reserves the right to waive any informali ties in bids, to accept any bid and to reject any or all bids should it be deemed for the best interest of the City to do so. The City reserves the right to substantiate the bidder’s qualifications, capability to perform, availability, past performance record and to verify that the pro poser is current in its obligations to the City, as follows

GC Bidding

Playgrounds / Parks / Athletic Fields

$250,000.00

Public - City

Outdoor Lighting, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition, Building Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Decking
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Membrane Roofing, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Flooring, Resilient Flooring
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Art, Sculptures, Furnishings and Accessories, Portable Lamps, Lamps, Multiple Seating, Pews and Benches, Benches
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Tubs and Pools, Hot Tubs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
43
Bidding Soon
762
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 1, 2025

img_map_placeholder

595 Congress St, Portland, ME

Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Congress Square Park Improvements - Phase B

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.