BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Demolition, site work, renovation and addition to a mixed-use development in Saint Ansgar, Iowa. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

he work for the project shall be accomplished under a Single Construction Contract and there will be a Single Bid to include all of the following: 1. General Construction. 2. Mechanical Construction, including: Plumbing, Heating, Ventilating, and Air Conditioning. 3. Electrical Construction, including: Power, Lighting, Communication, and Fire Safety. On-site mobilization and construction may begin immediately for the addition portion of the project, and shall begin no sooner than May 27, 2025 for the renovation portion of the project. The actual on-site starting date for the renovation may vary depending on the established last day of school instruction for the 2024-2025 school year. The Owner requires substantial completion for the project by August 22, 2025 for the renovation area and December 12, 2025 for the addition (dependent upon material delivery lead times). Each Bid shall be accompanied by Bid Security, in a separate sealed envelope, in the form of either (1) cash, cashiers check or certified check or certified share draft drawing on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to at least Five (5%) Percent of Project Bid Amount or (2) a Bid Bond executed by a corporation authorized to contract as a surety in the State of Iowa with the amount or penal sum of not less than Five (5%) Percent of Project Bid Amount. Such bid security shall be forfeited to the St. Ansgar Community School District as liquidated damages in the event the successful bidder fails or refuses to enter into a Contract within ten (10) days after the Award of Contract and post bond satisfactory to said owner insuring the faithful fulfillment of the Contract pursuant to the provisions of this Notice and the other Contract Documents The Board of Education of the St. Ansgar Community School District of St. Ansgar, IA, reserves the right to reject any or all bids and waive all informality and irregularity in connection therewith if the same is judged to be in their best interests, and to make a selection, including that of any Alternate Bids, that in their judgment is best suited for the purpose intended for the project. Submit inquires pertaining to the bidding documents to Mark Kroemer, at Atura Architecture, 912 N 13 th Street, Clear Lake, IA 641-357-1923 (voice), markk@aturaarchitecture.com (e-mail).

Bid Results

Educational

$3,050,000.00

Public - City

Addition, Demolition, Renovation, Site Work

62

24

26

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
55
Bidding Soon
629
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 27, 2025

Project location map

To Be Determined, Saint Ansgar, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.