BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2025 at 8:00 PM

Updated May 13, 2025

This is a service / maintenance or supply contract in Camarillo, California. Contact the soliciting agency for additional information.

Traffic Control Services Managing traffic during construction is necessary to minimize traffic delays, maintain motorist and worker safety, complete roadwork in a timely manner, and maintain access for businesses and residents. Effective work zone traffic management includes assessing work zone impacts and documenting strategies for mitigating the impacts in a transportation management plan (TMP). Work zone traffic management strategies should be identified based on the project constraints, construction phasing/staging plan, type of work zone, and anticipated work zone impacts. Once these strategies are implemented, they need to be monitored to ensure they effectively manage work zone impacts. Examples of possible performance measures for work zone traffic management strategies include volume, travel time, queue length, delay, number of incidents, incident response and clearance times, contractor incidents, community complaints, user costs, and cumulative impacts from adjacent construction activities. The selected firm(s) will work directly with the District's Collections staff to develop traffic control plans, which will be submitted to the City of Camarillo Public Works Department for review and approval by the City of Camarillo Transportation Engineer. Once approved the proposed work will be scheduled and executed. The agreement is for three (3) years and may be extended by mutual agreement for up to two (2) one-year terms. The City will accept bids only from bidders that (along with all subcontractors listed) are currently registered and qualified to perform public work pursuant to Labor Code section 1725.5; provided, however, that if a bidder is a joint venture (Business & Professions Code 7029.1) or if federal funds are involved in the project, then City may accept a non-complying bid provided that the bidder and all listed subcontractors are registered at the time the contract is awarded. Information online. City reserves the right to open all bids submitted. Award of contract will go to the lowest responsible bidder. The right is reserved to reject any and all bids, to accept one part and reject the other, and/or award an order or orders as will best serve the interests of City. In the event of any such rejection, City shall not be liable for any costs incurred in connection with the preparation and submittal of a bid. Incomplete or non-conforming bids will be rejected. Any inquiries regarding the Notice Inviting Bids should be directed to Darrin Carter, Water Reclamation Superintendent, at 805-383-5665 or DCarter@cityofcamarillo.org. Questions pertaining to the bid documents are to be submitted through electronically. Type of Award Lump Sum Bid Valid 90 Days Start/Delivery Date 07/01/2025 Project Duration Three (3) years Pre-Bid Meeting No Online Q&A No Contact Info Darrin Carter/805-383-5665 dcarter@cityofcamarillo.org

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
432
Active Projects
223
Bidding Soon
2,375
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

July 1, 2025

Project location map

Multiple Locations, Camarillo, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.