BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated May 14, 2025

Renovation of an elderly care / assisted living facility in Bracebridge, Ontario. Completed plans call for the renovation of a elderly care / assisted living facility.

Supply and delivery of The Pine Long Term Care Home boiler replacement scope of work. Question Deadline 04/11/2025 04:30:00 PM ET Any questions about this bid - Click here to submit them. District Municipality of Muskoka may post responses here or may issue an addendum responding to your questions. Documents can be obtained from https://www.biddingo.com/ Bidders are to provide a bid for full scope of services as outlined in Keith Lang Engineering Limited drawings ME-1 Rev. 2 and M-1 Rev. 2 dated December 11, 2024, and included in Appendix F. Work to be completed as allowed under the outline of interruption of active services and in the sequence of work on sheet M-1. The removal of the existing boiler and replacement boiler as specified as a Lochinvar Model AWH0800NPM, complete with all associated plumbing, tempering valve, communications/controls, venting, immersion aquastat and all materials required to complete the scope of work as noted on Drawing M-1. The District will consider proposed alternates, but they must meet all specifications as outlined in the contract documents and meet performance requirements. Proposed alternates for equipment must be submitted with the bidder's bid submission for acceptance. Acceptance of proposed alternates will be at the District's sole discretion. Commissioning, staff training on equipment and manual is to be included before the project will be considered complete. One (1) hard copy and electronic version of the manual is to be submitted to the District for acceptance including all operational, maintenance and warranty information, including a set of as-built drawings in both hardcopy and electronic versions. 2. Scope of Work The scope of the work includes all labour, materials and appurtenances to complete the replacement of the existing boiler plant at The Pines Long Term Home located at 98 Pine Street in Bracebridge, Ontario. This boiler is being replaced due to age to avoid failure. This boiler services the laundry and kitchen areas of the building. Therefore allowable work hours for interruption of hot water will be 7:30pm to 8:00am. See drawings for a schedule of work that can be done during regular working hours in advance of a hot water shutdown. There will be some cross over services with the boiler that services the resident units with the addition of a mixing valve as per the contract documents. Please refer to Appendix F - Specifications & Drawings for complete details of the required scope of work. 3. Project Schedule Bidders are to submit a project schedule, with their bid submission, to complete the scope of work herein, indicating approximate project start and completion timelines. The successful bidder will then provide a detailed schedule which would include confirmation of equipment availability, shop drawing reviews by all parties and equipment lead times to delivery arriving on site.

Bid Results

Elderly Care / Assisted Living

$84,177.00

Public - County

Renovation

4

5

2

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
43
Bidding Soon
788
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

May 30, 2025

Project location map

98 Pine St, Bracebridge, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.