Renovation of an educational facility in Mayville, North Dakota. Completed plans call for the renovation of a educational facility.
Agassiz Hall Pump Replacement Project Project Work Consists of but is Not Limited to the Following: The Project Scope is the Removal and Replacement of Hydronic Pumps, Steam to Water Heat Exchanger Along With All Steam and Water Specialties. All Work Included in the Contract Must Be Substantially Completed on or Before October 31st, 2025. The Project Will Be Completed as Equipment Becomes Available. All work included in the contract must be substantially completed on or before October 31st, 2025. The Bid Submittal Requires Three Clearly Marked Responses in Jaggaer, a Company S Names Contractors License, Company S Names Bid Bond, and a Company S Name Bid Form. Each Bid Proposal Shall Be Made Out on the Form Contained in the Project Specifications and Uploaded in the Response. In the Bid Bond Response, the Bidder Must Include a Bid Bond Executed by a Corporation Authorized to Contract as a Surety in the State of North Dakota in an Amount Not Less Than 5% of the Bid Amount. The Bid Security Should Be Made Payable to the Mayville State University and Must Not Contain Any Conditions Either in the Body or as an Endorsement Thereon. The Bid Security Shall Be Forfeited to Mayville State University as Liquidated Damages in the Event the Successful Bidder Fails or Refuses to Enter Into a Contract Within Ten (10) Days After the Award of Contract and the Maintenance of Said Work, if Required, Pursuant to the Provisions of This Notice and Other Contract Documents. No Bidder May Withdraw This Bid Within Sixty (60) Days After the Actual Date of the Opening Thereof. The Bid Bond of the Three Lowest Bidders for Each Contract Will Be Retained Until the Contract Has Been Awarded and Executed, but No Longer Than Sixty (60) Days After the Date of the Bid. No Bid Will Be Read or Considered Which Does Not Fully Comply With the Above Requirements as to Bond and Licenses, and Any Deficient Bid Submitted Must Be Resealed and Returned to the Bidder Immediately. Question Deadline 08/14/2025: Direct questions to the Procurement Officer, Sammy Hogan at s.hogan@und.edu. Clarifications requested by bidders must be in writing not less than 5 days before date set for receipt of bids.
Bid Results
Educational
$244,543.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2025
September 19, 2025
330 3rd St NE, Mayville, ND
Related To This Project
Mayville, ND
Bid Date: Jun 06 2025
Mayville, ND
Bid Date: Jul 30 2025
Mayville, ND
Bid Date: Aug 19 2025
Mayville, ND
Bid Date: Aug 19 2025
Mayville, ND
--
Mayville, ND
Bid Date: Feb 27 2026
Mayville, ND
Bid Date: Mar 26 2025
Mayville, ND
Bid Date: Mar 26 2025
Mayville, ND
Bid Date: Apr 03 2025
Mayville, ND
Bid Date: Oct 29 2024
Mayville, ND
Bid Date: Sep 04 2024
Mayville, ND
Bid Date: Aug 27 2024
Mayville, ND
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.