BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Middle Township, Indiana. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

DESCRIPTION OF WORK: Work for which proposals are to be received includes the replacement of Bridge No. 33 carrying North County Road 150 East over Croft Ditch. The work will consist of replacing the existing structure with a single-span, spread, composite, prestressed concrete box beam bridge. Along with the bridge work, approximately 170 feet of approach roadway construction is included in the immediate vicinity of the bridge. BID SECURITY: Each bid shall be accompanied by an acceptable certified check made payable to the Noble County Board of Commissioners or an acceptable bid bond in the amount equal to 10% of the total bid price executed by an incorporated surety company in good standing and qualified to do business in the State of Indiana and whose name appears on the current Treasury Department Circular 570. BONDS: A Performance Bond and Payment Bond each in the amount of 100% of the Contract price will be required from the Contractor to whom the work is awarded. PRE-BID CONFERENCE: No prebid conference is scheduled for the project. The Owner reserves the right to retain any and all bids for a period of not more than 60 days and said bid shall remain in full force and effect during said time. The Owner further reserves the right to waive informalities and to award the Contract to any Bidder all to the advantage of Noble County or to reject any and all bids. Question Deadline 04/18/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email Daniel Kurdziel & Skyler Coombs at dkurdziel@kbengr.com & scoombs@kbengr.com

Bid Results

Bridges / Tunnels

$771,404.00

Public - County

Demolition, New Construction, Paving, Site Work

23

13

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
46
Bidding Soon
819
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2025

May 28, 2025

Project location map

N County Rd 150 E, Middle Township, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.