Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2025 at 8:00 PM
Updated May 9, 2025
Site work for a water / sewer project in Broken Arrow, Oklahoma. Completed plans call for site work for a water / sewer project.
Bids on the following Work: SHENANDOAH VALLEY AT BATTLE CREEK POND OUTLET STRUCTURE: This project includes repairing the leaking dam at the spillway of the Pond at Battle Creek west of N. Oak Ave. Contract time for this project shall be sixty (60) calendar days Sworn statement of the Bidder's assets and liabilities, technical qualifications and performance in the form of the latest annual report and financial statement are not required to be submitted with the Bidder's Proposal, but City of Broken Arrow may require such statements prior to award of the construction contract. The References, using the forms found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in the City of Broken Arrow considering the Bid non-responsive and result in rejection of the Bid by the City of Broken Arrow. Bidders may be required to provide supplemental information if requested by the City of Broken Arrow to clarify, enhance or supplement the information provided in the References. The apparent successful Bidder shall, within two (2) days after Bid opening, submit to The City a list of the Suppliers, individuals or entities proposed for the following portions of the Work: storm sewer construction, road patching, & waterline relocation. Such list shall be accompanied by a Statement of Qualifications, using the forms found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If The City or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, The City may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. If apparent Successful Bidder declines to make any such substitution, The City may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by The City, submit to The City the above required list of the Subcontractors, Suppliers, and other individuals or entities. In evaluating whether a Bidder is responsible, City of Broken Arrow will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided above. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to the City of Broken Arrow. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by City of Broken Arrow in the amounts equal to the Contract price.
Award
Water / Sewer
$69,250.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2025
May 15, 2025
Multiple Locations, Broken Arrow, OK
Related To This Project
Broken Arrow, OK
Bid Date: Apr 10 2025
Broken Arrow, OK
Bid Date: Apr 15 2025
Broken Arrow, OK
Bid Date: Apr 22 2025
Broken Arrow, OK
Bid Date: Apr 24 2025
Broken Arrow, OK
--
Broken Arrow, OK
Bid Date: May 01 2025
Broken Arrow, OK
--
Broken Arrow, OK
--
Broken Arrow, OK
Bid Date: Apr 29 2025
Broken Arrow, OK
Bid Date: Apr 16 2025
Broken Arrow, OK
Bid Date: Apr 11 2025
Broken Arrow, OK
--
Broken Arrow, OK
--
Broken Arrow, OK
--
Broken Arrow, OK
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
