Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 28, 2025 at 8:00 PM
Updated April 29, 2025
Renovation of an educational facility in Adair, Iowa. Completed plans call for the renovation of a educational facility.
The project includes removal of fully adhered EPDM roofs, ballasted EPDM roofs, ballast, and flashings, proposed fully adhered EPDM roofs, flashings, and other miscellaneous improvements as required. Site Directions: Project is located at the Adair-Casey Elementary School, 3384 Indigo Avenue, Adair, IA 50002. Contractor shall fully complete the project no later than August 18, 2025. Should the contractor fail to complete the work in this timeframe, liquidated damages of $500.00 per calendar day will be assessed for work not completed within the designated contract term. Notice to Proceed is anticipated on May 27, 2025. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, and in the amount of 10% of the total amount of the bid as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Jurisdiction. The bid shall contain no condition except as provided in the specifications. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by Adair-Casey Community School District and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless Adair-Casey Community School District from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two years from and after acceptance of the contract. The guaranteed maintenance period for new paving shall be four years. The Adair-Casey Community School District does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the jurisdiction.
Award
Educational
$280,508.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2025
May 27, 2025
3384 Indigo Ave, Adair, IA
Related To This Project
Adair, IA
Bid Date: May 29 2025
Adair, IA
Bid Date: Jun 30 2025
Adair, IA
Bid Date: Mar 24 2025
Adair, IA
Bid Date: Feb 11 2025
Adair, IA
Bid Date: Nov 22 2021
Adair, IA
Bid Date: Nov 19 2024
Adair, IA
Bid Date: Oct 07 2024
Adair, IA
--
Adair, IA
Bid Date: Jun 18 2024
Adair, IA
Bid Date: Jun 18 2024
Adair, IA
--
Adair, IA
Bid Date: Jul 19 2022
Adair, IA
Bid Date: Aug 14 2019
Adair, IA
Bid Date: Sep 10 2019
Adair, IA
Bid Date: Feb 03 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
