BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 24, 2025 at 8:00 PM

Updated May 1, 2025

Site work and paving for a transportation facility in Morrisville, North Carolina. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

All Contractors are hereby notified that they must comply with any and all Federal or State Contractor Licensing Requirements including any requirements applicable for furnishing and installing the work depicted in bid documents. General Contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina will be observed in receiving and awarding general contracts. Each bid shall be accompanied by a cash deposit or a certified check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation in an amount equal to but not less than 5% of the proposal or a bid bond of 5% of the bid executed as set forth in the Instruction to Bidders by a surety company licensed under the laws of North Carolina to execute such bonds. The deposits shall be made payable to the Owner and shall be retained by the Owner as liquidated damages in the event the successful bidder fails to properly execute the contract within ten (10) days after the award and to give satisfactory surety as required by law. By submitting a bid, the Contractor certifies that it, and its proposed subcontractors, has under its direct control or at his disposal the personnel, equipment and materials required to execute the Project work as specified. Lack of such control or availability of personnel, equipment and materials shall constitute failure to properly execute the contract. Performance and Labor and Material Payment Bonds will be required for 100% of the Contract Sum. The Owner reserves the right to retain all bids for a period of 90 days after the scheduled closing time for receipt of bids. No bid may be withdrawn by a bidder within 90 days after the scheduled closing time for receipt of bids. The Owner reserves the right to reject any or all bids and to waive informalities and minor irregularities. It is the policy of the Authority that neither the Authority, its contractors, service providers, subcontractors nor vendors, shall discriminate on the basis of race, color, religion, national origin, or gender in the award and performance of contracts, subcontracts and purchases. The Authority has established a Minority and Women-Owned Small Business Program (MWSB Program) to encourage equal opportunity for MWSBs to compete for employment as contractors, subcontractors, suppliers and service providers. It is also the Authority's policy to remove barriers which may exist for MWSBs to compete for contracts, subcontracts and procurement awarded by the Authority. Additional information concerning the Authority's MWSB Program may be found on the internet at: online. The MWSB Goals for MWSB participation on this contract represent the total dollars that will be spent with MWSBs as a percentage of the total contract amount, including any change orders and contingency. In accordance with the MWSB Program, the Authority will require that the selected firm must either meet the MWSB goals or demonstrate that the bidder has made sufficient good faith efforts to meet the MWSB goals. The MWSB goals are as follows: Minority-owned businesses - 3% Woman-owned small businesses - 3% All questions concerning the Plans and Specifications during the bidding period must be emailed to the attention of Hillary Sudbury, Project Manager at hillary.sudbury@rdu.com. Please insert "Question(s) - 5R23L at A2" as the subject for the email. The Authority, the Project Management Team, and the Engineer are not obligated to respond to questions submitted verbally concerning interpretation of the Plans and Specification, including those raised at the Pre-Bid conference, but shall instead direct the person or company raising the question to direct the question to the Owner as indicated herein. The deadline for receipt of questions is April 10, 2025 at 4:00 PM. The Authority, The Project Management Team, and the Engineer do not commit, and are not obligated, to respond to all questions submitted in writing, but, in their sole discretion, may respond in the form of an addendum to questions which they believe require clarification of the Contract Documents. The Authority reserves the right to revise the schedule in its sole discretion.

Post-Bid

Transportation Terminals

$1,000,000.00

Public - City

Paving, Site Work

19

19

3

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
136
Bidding Soon
1,637
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

July 1, 2025

Project location map

2400 John Brantley Blvd, Morrisville, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.