BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 6, 2025 at 8:00 PM

Updated October 7, 2025

Site work for a playground / park / athletic field in Boston, Massachusetts. Design plans call for site work for a playground / park / athletic field.

As of October 6, 2025, an engineer has been selected, and this project is in the early design phase. Design is estimated to be completed in March 2026. It is anticipated bidding will commence in May 2026, with construction starting in August 2026 and ending in August 2027. *The closed solicitation has been included below for reference: RFQ ~Condor Urban Wild East Boston, MA. Design & Engineering Services. The method of Contractor Selection has not been Determined at this time.

Design

Playgrounds / Parks / Athletic Fields

$950,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
562
Active Projects
325
Bidding Soon
4,009
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2026

Project location map

300 Condor St, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.