BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated May 14, 2025

Renovation of a water / sewer project in West Chester, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

Pleasant Grove Pump Station Reconstruction Contract 25-s1a, General Construction Contract 25-s1b, Electrical. This project generally consists of but is not limited to, replacing the existing wet/dry well pump station with a precast submersible pump station including new wet well and valve vault. Additional work includes, but is not limited to, installation of a new force main to connect to the existing force main at the road, new natural gas service for emergency generator, water service line with yard hydrant, installation of new influent gravity sewer, natural gas generator (generator and ATS to be procured and provided by the Owner), site improvements and chain link fencing. Also included in the scope of work is the demolition of the existing interior components of the pump station building including removal of electrical and mechanical equipment, concrete demolition, and filling the subgrade wet/drywell with stone and capping with concrete. The proposed electrical/mechanical equipment and pump controls will be housed in the existing building. Work of two contracts comprises the entire project for the Pleasant Grove Pump Station Reconstruction, for Westtown Township. Reconstruction of the existing Pleasant Grove Pump Station Question Deadline 04/23/2025 at 3:00 PM ET Each bid must be accompanied by a certified check drawn to the order of Westtown Township, or a Bid Bond in favor of Westtown Township in the amount of 10% of the bid price. Said check or bond shall be subject to the conditions provided in the Instructions to Bidders. The work in connection with this project constitutes a Public Works by a Public Body under Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, must be paid to workmen employed on this project. No bid may be withdrawn within sixty (60) days of the date of the bid opening. Westtown Township reserves the right to reject any and all bids and to waive any bidding informalities.

Award

Water / Sewer

$1,088,228.00

Public - County

Renovation

22

27

2

4

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
704
Active Projects
329
Bidding Soon
4,281
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 29, 2025

Project location map

1147 S Concord Rd, West Chester, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.