BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Orono, Minnesota. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Replace Bridge #90623 along Brown Road (CSAH 146) over the Luce Line State Trail in the City of Orono. Purpose & Description: The existing bridge (built in 1955) consists of a timber structure with a concrete deck that extends over Long Lake Creek and the Luce Line State Trail. The timber material throughout the structure has experienced advanced deterioration. In addition, the concrete deck is showing signs of extensive wear due to the frequency and size of visible cracking. A full replacement is being recommended as routine maintenance and repair activities are no longer cost effective in preserving this bridge asset. As a result of a routine bridge inspection, weight restrictions prohibiting certain types of commercial vehicles were introduced in 2014. The proposed project will implement a new bridge that is designed for a 75-year service life. The completion of this project will ensure that a grade separated crossing of the Luce Line State Trail is retained to eliminate conflicts for people walking and biking along the trail underneath the bridge. Additionally, the existing railing and guardrail will be upgraded to satisfy current design standards to ensure user safety. Furthermore, this project will eliminate weight restrictions along a collector route through the Orono Area. As of March 27, 2025 ,This project is included in the County's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$2,780,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
137
Bidding Soon
1,544
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.