BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

Renovation of a mixed-use development in Fort Wayne, Indiana. Completed plans call for the renovation of a educational facility.

** As of May 15, 2025, project was awarded to Current Mechanical, awarded amount is $ 1,974,000 ** 2025 Maintenance Air Handler Replacement Each bid proposal shall include all labor, material and services necessary to complete the projects in strict accordance with the drawings and specifications as prepared and on file in the office of: Primary Engineering, Inc. Bids shall be received from a single prime contractor. Bids received after that time or in another location shall be returned to the bidder unopened. Each bid shall be accompanied by a certified check, a cashier's check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Southwest Allen County Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within ten (10) days after the contract is awarded to such bidder by Southwest Allen County Schools, Southwest Allen County Schools may declare the certified check, cashier's check or bid bond forfeited to Southwest Allen County Schools, as liquidated damages. A bid may not be modified, withdrawn or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Southwest Allen County Schools. Southwest Allen County Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Southwest Allen County Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion.

Award

Educational

$1,974,000.00

Public - County

Renovation

30

14

11

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
82
Bidding Soon
1,057
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

May 15, 2025

Project location map

4810 Homestead Rd, Fort Wayne, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.