BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2025 at 8:00 PM

Updated September 25, 2025

Site work for a water / sewer project in Forest Lake, Minnesota. Completed plans call for site work for a water / sewer project.

Question Deadline 04/10/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. Description of Work: the Work Includes the Construction of Approximately: Recoating and Rehabilitation of a 500,000 Gallon Single Pedestal Water Tower Including: Complete Removal and Replacement of the Interior Wet Coating System, Partial Complete Removal and Replacement and Spot Repairs of the Interior Dry Coating System, Overcoating ofthe Exterior Coating System, and Miscellaneous Structural and Appurtenance Rehabilitation/repairs; Together With Numerous Related Items of Work, All in Accordance With Plans and Specifications. Completion of Work: All Work Under the Contract Must Be Substantially Complete 75 Calendar Days From Notice to Proceed; Final Completion Must Be Within 105 Calendar Days From Notice to Proceed. Direct Inquires to Engineer's Project Manager, Jamie Connor, at 507-382-7706 Bid Security: a Proposal Bond in the Amount of Not Less Than 5 Percent of the Total Amount Bid, Drawnin Favor of the City of Forest Lake, Minnesota, Shall Accompany Each Bid. Owner's Rights Reserved: the Owner Reserves the Right to Reject Any or All Bids and to Waive Any Irregularities and Informalities Therein and to Award the Contract to Other Than the Lowest Bidder if, in Their Discretion, the Interest of the Owner Would Be Best Served

Award

Water / Sewer

$349,450.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
164
Bidding Soon
1,554
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 19, 2025

Project location map

To Be Determined, Forest Lake, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.