BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work and paving for a mixed-use development in Bloomington, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reconstruct Nicollet Avenue (CSAH 52) from 98th Street (CSAH 1) to 89th Street in the City of Bloomington. Purpose & Description: The existing roadway (last reconstructed in 1962) is nearing the end of its useful life and warrants replacement. Routine maintenance activities (such as overlays and crackseals) are no longer cost effective in preserving assets. The roadway was originally constructed as concrete pavement, causing premature surface cracking at joints after the completion of each pavement overlay. The existing sidewalk facilities are located immediately adjacent to the roadway, causing a feeling of discomfort for people walking. The curb has experienced settling, greatly diminishing its ability to collect water and define the roadway edge. Many intersections include ADA accommodations that do not meet current design requirements, causing challenges for people with limited mobility. It should be noted that the intersection of Nicollet Avenue (CSAH 52) at 90th Street was updated in 2010 as part of a spot mobility project that was completed by the City of Bloomington. Staff will explore opportunities to avoid disturbing these recent investments at this intersection. Additionally, a three-lane typical section was introduced along Nicollet Avenue (CSAH 52) as part of a paving project in 2019 to better facilitate vehicle turning movements and provide traffic calming. The proposed project is anticipated to include new assets, including pavement, curb, storm water structures, sidewalk, and traffic signals. Specific pedestrian crossing enhancements (such as curb extensions, raised medians, and crossing beacons), bikeway accommodations, and streetscaping features will also be considered as part of the project development process in an effort to benefit non-motorized users. Furthermore, this project presents an opportunity to improve school arrival and dismissal operations for Kennedy High School located near the southern termini of the project Construction Q2 2027 - Q4 2028 Completion 2029 The project is included in the County 2026-2030 Capital Improvement Program (CIP). As of November 12, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$10,000,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
0
Bidding Soon
790
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

Project location map

Nicollet Ave, Bloomington, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.