BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Site work and paving for a mixed-use development in Patton Village, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The removal and in-kind replacement of the existing 66,000 gallon bolted galvanized steel ground storage tank ("GST"), the removal and in-kind replacement of the existing 5,000 gallon hydropneumatics tank ("HPT"), the installation of an emergency diesel generator with a 24-hour fuel tank at full load and an elevated concrete access platform, the installation of an all-weather access driveway, improvements to the existing chain link fence and gate, and associated piping and electrical improvements. Question Deadline 04/09/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Post-Bid

Water / Sewer

$600,000.00

Public - City

Paving, Site Work

18

21

6

4

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
394
Active Projects
203
Bidding Soon
3,486
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

May 16, 2025

Project location map

17190 Main St, Patton Village, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.