Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 12, 2026 at 8:00 PM
Updated March 13, 2026
Renovation of a fitness / recreation center in Saint John, New Brunswick. Working plans call for the renovation of a fitness / recreation center.
Refurbishment of the Canada Games Aquatic Centre (CGAC). Phase 1 includes: replacement of the competition pool bulkhead and pool guard chair. Provide construction management services for CGAC renovations including constructability reviews, cost planning and budgeting, procurement strategies for long-lead items, tendering and selection of trade subcontractors, site management, coordination with the consultant team, commissioning support, and project closeout, with work aligning to Phases C to E and a firm completion deadline of June 30, 2028 In early 2025, the City of Saint John procured for the services of a qualified architectural firm (Consultant) to lead a multi-disciplinary team for the design and construction management of the refurbishment of the Canada Games Aquatic Centre (CGAC). In addition to architectural expertise, the consulting team includes professionals in civil, mechanical, electrical, structural, and energy engineering, as well as other specialized disciplines such as cost consultants required to successfully design and manage this complex project. MJMA/Acre Architects were selected as the joint architectural partners for the project. In all matters, the Consultant shall act as a trusted advisor to the City, providing regular updates on all key aspects of the project, including design, procurement, and construction progress. Question Deadline: Tue Feb 17, 2026 4:00:00 PM (AST) The scope of work expected for the Division 13 Pool Subconsultant is expected to include, but may not be limited to: - A Total of three (3) new bodies of water, which would include: o A warm-up Lap Pool (Cast-in-Place concrete pool tank), complete with: 5 x 25M lanes, 1M to 1.2M in depth (sloping). A barrier free entry ramp. A full perimeter overflow gutter system. A full tile finish (interior of pool tank), c/w 6 lane markings and end wall targets. A Regenerative Media Filtration System (see Design Data). A 10 HP Recirculation pump (see Design Data). An 80 sq ft underground concrete Surge Tank adjacent to the Lap Pool (under the deck). o A Tots Pool (Cast-in-Place concrete pool tank), complete with: An area of 1,222 Sq Ft with a water depth of 0.9M. A barrier free entry ramp. Entry Steps. A full perimeter overflow gutter system. A full tile finish (interior of pool tank) An adjacent Deck Mounted Runout Waterslide (3.2M Total Height ~) by Polin Waterparks A Regenerative Media Filtration System (see Design Data). A 7.5 HP Recirculation pump (see Design Data). A 15 HP Waterslide Pump (see Design Data). An 80 sq ft underground concrete Surge Tank adjacent to the Pool (under the deck). o A Hot Spa (Cast-in-Place concrete pool tank), complete with: An area of 161 Sq Ft with a water depth of 0.9M. Entry Steps. A Skimmer recirculation system. A full tile finish (interior of pool tank) Perimeter surround bench with Hydro Massage jets A Regenerative Media Filtration System (see Design Data). A 7.5 HP Recirculation pump (see Design Data). A 7.5 HP Hydrojet Pump (see Design Data). - Renovations to the existing 50M Competition Pool, which would include: A new Movable Bulkhead, with automatic/mechanical movement capabilities (not only hand operated). New bulkhead is to accommodate new starting blocks as well (x8). New pool gutter grating down both sides of the 50M pool, to match new pools (1.5 thick Emco Grating). An option to re-tile the entire existing 50M Competition Pool
Final Planning
Fitness / Rec Centers
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2026
October 19, 2026
50 Union St, Saint John, NB
Related To This Project
Saint John, NB
Bid Date: Apr 16 2025
Saint John, NB
Bid Date: Apr 15 2025
Saint John, NB
Bid Date: Apr 22 2025
Saint John, NB
Bid Date: Apr 15 2025
Saint John, NB
Bid Date: Apr 24 2025
Saint John, NB
Bid Date: Apr 29 2025
Saint John, NB
Bid Date: Apr 30 2025
Saint John, NB
Bid Date: May 02 2025
Saint John, NB
Bid Date: Apr 24 2025
Saint John, NB
Bid Date: Apr 23 2025
Saint John, NB
Bid Date: Apr 17 2025
Saint John, NB
Bid Date: Apr 14 2025
Saint John, NB
Bid Date: Apr 29 2025
Saint John, NB
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
