BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 12, 2026 at 8:00 PM

Updated March 13, 2026

Renovation of a fitness / recreation center in Saint John, New Brunswick. Working plans call for the renovation of a fitness / recreation center.

Refurbishment of the Canada Games Aquatic Centre (CGAC). Phase 1 includes: replacement of the competition pool bulkhead and pool guard chair. Provide construction management services for CGAC renovations including constructability reviews, cost planning and budgeting, procurement strategies for long-lead items, tendering and selection of trade subcontractors, site management, coordination with the consultant team, commissioning support, and project closeout, with work aligning to Phases C to E and a firm completion deadline of June 30, 2028 In early 2025, the City of Saint John procured for the services of a qualified architectural firm (Consultant) to lead a multi-disciplinary team for the design and construction management of the refurbishment of the Canada Games Aquatic Centre (CGAC). In addition to architectural expertise, the consulting team includes professionals in civil, mechanical, electrical, structural, and energy engineering, as well as other specialized disciplines such as cost consultants required to successfully design and manage this complex project. MJMA/Acre Architects were selected as the joint architectural partners for the project. In all matters, the Consultant shall act as a trusted advisor to the City, providing regular updates on all key aspects of the project, including design, procurement, and construction progress. Question Deadline: Tue Feb 17, 2026 4:00:00 PM (AST) The scope of work expected for the Division 13 Pool Subconsultant is expected to include, but may not be limited to: - A Total of three (3) new bodies of water, which would include: o A warm-up Lap Pool (Cast-in-Place concrete pool tank), complete with: 5 x 25M lanes, 1M to 1.2M in depth (sloping). A barrier free entry ramp. A full perimeter overflow gutter system. A full tile finish (interior of pool tank), c/w 6 lane markings and end wall targets. A Regenerative Media Filtration System (see Design Data). A 10 HP Recirculation pump (see Design Data). An 80 sq ft underground concrete Surge Tank adjacent to the Lap Pool (under the deck). o A Tots Pool (Cast-in-Place concrete pool tank), complete with: An area of 1,222 Sq Ft with a water depth of 0.9M. A barrier free entry ramp. Entry Steps. A full perimeter overflow gutter system. A full tile finish (interior of pool tank) An adjacent Deck Mounted Runout Waterslide (3.2M Total Height ~) by Polin Waterparks A Regenerative Media Filtration System (see Design Data). A 7.5 HP Recirculation pump (see Design Data). A 15 HP Waterslide Pump (see Design Data). An 80 sq ft underground concrete Surge Tank adjacent to the Pool (under the deck). o A Hot Spa (Cast-in-Place concrete pool tank), complete with: An area of 161 Sq Ft with a water depth of 0.9M. Entry Steps. A Skimmer recirculation system. A full tile finish (interior of pool tank) Perimeter surround bench with Hydro Massage jets A Regenerative Media Filtration System (see Design Data). A 7.5 HP Recirculation pump (see Design Data). A 7.5 HP Hydrojet Pump (see Design Data). - Renovations to the existing 50M Competition Pool, which would include: A new Movable Bulkhead, with automatic/mechanical movement capabilities (not only hand operated). New bulkhead is to accommodate new starting blocks as well (x8). New pool gutter grating down both sides of the 50M pool, to match new pools (1.5 thick Emco Grating). An option to re-tile the entire existing 50M Competition Pool

Final Planning

Fitness / Rec Centers

Public - City

Renovation

67

9

6

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
0
Bidding Soon
230
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

October 19, 2026

Project location map

50 Union St, Saint John, NB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.