Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 11, 2025 at 8:00 PM
Updated July 12, 2025
Renovation of a transportation facility in Corpus Christi, Texas. Working plans call for the renovation of a transportation facility.
As of 7/11/2025, The City of Corpus Christi has decided to cancel the project and plans to rebid the project in FY 26. TSA Equipment Relocation Phase II The City of Corpus Christi, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business will be afforded full and fair opportunity to submit bids in response to this invitation and no businesses will be discriminated against on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability in consideration for an award Improvements to Room 1034 at Corpus Christi International Airport. Improvements include, but are not limited to, relocation or disposal of existing equipment; relocation of existing CT-80 scanning equipment and appurtenances; Contractor to furnish and maintain appropriate and adequate dust control around scanning during construction activities; floor repair where the existing TSA screening equipment is removed from ticketing lobby area; removal and storage or disposal of lights/diffusers as required for new fixtures; modifications to walls to accommodate for oversized baggage and work space; Construction of one (1) opening in the exterior masonry wall of the terminal building for a 6-ft roll up door; Installation of appropriate doors and / or draft curtains for baggage equipment; Installation of baggage conveyor equipment from interior ticketing area to exterior of the terminal building for baggage and installation of appropriate doors and / or draft curtain, doors and draft curtain to be Windstorm Compliant; removal, salvage, and storage of existing rollup door on the exterior and fill in door space with masonry that matches existing exterior masonry wall; Installation of new electrical circuits for baggage equipment, to drop down from ceiling OR sawcut and extend service from existing check-in counter to new baggage equipment location; Furnish and install appropriate LED lighting and switches; Furnish and install security improvements, including but not limited to, access control card readers, cameras, panic bar hardware on doors as noted; Furnish and install exterior wall insulation and finish gypsum board, including tape/float/texture/paint; Furnish and install acoustic dropdown ceiling; Cleaning of existing floor and installation of new flooring. This project is primarily funded by the Federal Aviation Administration (FAA) and FAA requirements apply. Base Work: Adding a new conveyor system for baggage transfer and an outbound conveyor pier; upgrading the electrical panel; installing HVAC tied to existing airport systems; adding new lighting; and modifying the wall behind ticket counters for baggage transfer. The space will retain an exposed, industrial ceiling and an unfinished concrete floor. Back-of-House Upgrades: Creating a west screening room with new conveyors, fire/security hardware, and an outbound bag sorting pier. Add Alternates include ticket counter conveyors and rollup doors for existing screening pods. The contractor will collaborate closely with TSA and airport personnel to meet security and regulatory requirements. Since the area is currently unused, no phased construction is necessary. Through additive alternates, the Airport's goals (in order of priority) are as follows: 1. Outbound baggage conveyor pier at Phase 1 west side to serve United Airlines 2. Outbound baggage conveyor pier at Phase 1 east side to serve American Airlines 3. Construction of Exterior Canopies at both Phase 1 and Phase 2 outbound conveyor piers 4. Inbound baggage conveyor at Phase 1 west side to serve United Airlines Ticket Counter 5. Inbound baggage conveyor at Phase 2 west side to serve Future Airline Ticket Counter Goals for minority participation for each trade: 0% Goals for female participation in each trade: 0% DBE Participation Goal is 11.4% Scope of Work The project scope of work includes: Improvements to Room 1034 at Corpus Christi International Airport. Improvements include, but are not limited to, relocation or disposal of existing equipment; relocation of existing CT-80 scanning equipment and appurtenances; Contractor to furnish and maintain appropriate and adequate dust control around scanning during construction activities; floor repair where the existing TSA screening equipment is removed from ticketing lobby area; removal and storage or disposal of lights/diffusers as required for new fixtures; modifications to walls to accommodate for oversized baggage and work space; Construction of one (1) opening in the exterior masonry wall of the terminal building for a 6-ft roll up door; Installation of appropriate doors and / or draft curtains for baggage equipment; Installation of baggage conveyor equipment from interior ticketing area to exterior of the terminal building for baggage and installation of appropriate doors and / or draft curtain, doors and draft curtain to be Windstorm Compliant; removal, salvage, and storage of existing rollup door on the exterior and fill in door space with masonry that matches existing exterior masonry wall; Installation of new electrical circuits for baggage equipment, to drop down from ceiling OR sawcut and extend service from existing check-in counter to new baggage equipment location; Furnish and install appropriate LED lighting and switches; Furnish and install security improvements, including but not limited to, access control card readers, cameras, panic bar hardware on doors as noted; Furnish and install exterior wall insulation and finish gypsum board, including tape/float/texture/paint; Furnish and install acoustic dropdown ceiling; Cleaning of existing floor and installation of new flooring. This project is primarily funded by the Federal Aviation Administration (FAA) and FAA requirements apply. Refer to contract documents, plans and specifications for additional information. The deadline to ask questions is 6/11/2025 4:00 PM CST All inquiries or requests regarding this RFB must be submitted in writing online via CivCast
Final Planning
Transportation Terminals
$3,489,410.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2025
January 12, 2026
1000 International Dr, Corpus Christi, TX
Related To This Project
Corpus Christi, TX
--
Corpus Christi, TX
Bid Date: Jun 11 2025
Corpus Christi, TX
Bid Date: May 01 2025
Corpus Christi, TX
--
Corpus Christi, TX
--
Corpus Christi, TX
Bid Date: May 22 2025
Corpus Christi, TX
Bid Date: May 15 2025
Corpus Christi, TX
--
Corpus Christi, TX
Bid Date: Apr 03 2025
Corpus Christi, TX
Bid Date: Apr 28 2025
Corpus Christi, TX
--
Corpus Christi, TX
Bid Date: May 01 2025
Corpus Christi, TX
Bid Date: Apr 15 2025
Corpus Christi, TX
Bid Date: Apr 15 2025
Corpus Christi, TX
Bid Date: Apr 15 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.