BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2025 at 8:00 PM

Updated March 26, 2026

Renovation of a water / sewer project in Santa Clarita, California. Completed plans call for the renovation of a water / sewer project.

License Requirements Refer to attached Contract Documents Question Deadline 04/30/2025 at 4:00 PM PT Online Q&A Yes Estimated Bid Value $2,000,000 to $2,300,000. Refer to attached Contract Documents for more information. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. A. The Project is generally described as demolition of the existing Switchboard, demolition of reduced voltage solid state starters (RVSS), as well as the installation of new Reduced Voltage Soft Starters (RVSS), outdoor pad modifications (as required), installation of new main service switchboard and distribution section, and select cabling (per contract drawings); and all materials and equipment, services and construction inherent to the Work. B. The existing control panel for remote control and communications is also to be demolished and replaced with a new control panel that includes pump station control logic, monitoring and communication equipment. The Work includes labor, material and equipment, services required for construction, testing, and commissioning of the Project in accordance with the Contract Documents and as more specifically described in the Specifications and Drawings and includes, but is not limited to, the following principal features. 1. Demolition a. Existing Exterior NEMA 3R Switchboard at Valencia Recycled Water Pump Station, including lighting panelboard and pump motor RVSS enclosures and their internal components. b. Selective demolition to separate existing SCADA Cabinet from Existing switchboard. c. Selective Switchboard pad demolition as shown on contract drawings. 2. New Work a. Selective Switchboard pad Modifications (as shown on the contract drawings). b. New incoming Utility Service Switchboard and RVSS units. c. New cabling where necessary (as shown on contract drawings). d. New cabling as needed for existing pump motors and new RVSS units. e. Installation of new mini power system to provide 120V/240V power to existing devices. f. New Grounding connections to and modifications of Existing Grounding Systems to accommodate new Switchboard installation

Award

Water / Sewer

$1,842,253.00

Public - City

Renovation

26

17

39

10

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
3
Bidding Soon
2,030
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

July 21, 2025

Project location map

28185 The Old Rd, Santa Clarita, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.