EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 1, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Ruston, Louisiana. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Intersection Improvements. PROJECT CLASSIFICATION: Highway, Street, and Bridge Construction CONTRACT TIME: 125 Calendar Days LIQUIDATED DAMAGES: $600.00 per Calendar Day. A Certified Check or Cashier's Check, payable to the City of Ruston or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to five percent (5%) of the total bid, shall be submitted with each bid. Bidders are advised that both a Performance Bond and a Payment Bond, each in the amount of 100 percent (100%) of the Contract Price, will be required. In no event shall proposal forms be issued later than twenty-four (24) hours prior to the hour and date set for receiving proposals. The Bidder is advised that the City of Ruston is an Equal Opportunity Employer. All Contractors bidding on this work shall comply with all provisions of the State Licensing Law for Contractors, R.S. 37:2150-2163, as amended, for all public contracts. It shall also be the responsibility of the General Contractor to assure that all subcontractors comply with this law. If required for bidding, Contractors must be licensed in the above proper category of work and must show their license number on the face of the sealed bid envelope. Bid proposals, amendments to bids, or request for withdrawal of bids, received after time specified for bid opening shall not be considered for any cause whatsoever The bid proposal is fim1 for a period of forty-five (45) days from the date of the opening of bids and no bid proposal can be withdrawn for any reason during this period of time. The City of Ruston reserves the right to reject any or all bid proposals for just cause and reserves the right to waive any and all informalities. Doc Notes: Any unsuccessful bidder, upon returning such set within ten days of bid opening and in good condition, will be refunded the deposit. Bidding documents (the contract documents, specifications, and drawings) can also be found on-line

GC Bidding

Bridges / Tunnels

$360,000.00

Public - City

Paving, Site Work

30

6

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill, Compaction, Embankments, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
19
Bidding Soon
205
All Active Projects
98
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

img_map_placeholder

W Carolina Ave & N Homer St, Ruston, LA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Intersection Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.