Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated November 15, 2025
New construction and renovation of a water / sewer project in Barnstable, Massachusetts. Completed plans call for the renovation of a 1,584-square-foot water / sewer project; and for the construction of a 13,300-square-foot water / sewer project.
Ref. #: Questions Due Date: May 9th 2025, 12:00 PM EDT Questions through Online Portal The work generally consists of, but is not limited to, upgrades at the existing Straightway Water Treatment Facility and Site, including a new 11,000 ft2 municipal water treatment facility with greensand filtration, granular activated carbon (GAC) contactors, advanced oxidation using hydrogen peroxide and ultraviolet (UV) reactors, and chemical feed systems. The work also includes a new 2,300 ft2 building to be constructed around existing outdoor GAC contactors, two new municipal drinking water wells and associated pump stations, modifications to the existing booster pump station, modifications to the existing Straightway Treatment Facility, site work and exterior piping systems, stormwater management features, selective demolition within existing facilities, and complete demolition of the existing Simmons Pond and Hyannisport Facilities. The work includes two bid alternates. The Owner may choose, at their option, to include the alternates as outlined in Specification Sections 00301, 00302A through 00302H, and 01025 in the order provided. Disadvantaged MBE (D/MBE) 4.2% Disadvantaged WBE (D/WBE) 4.5% Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. A. The work generally consists of the winterization of existing GAC contactors used for the removal of PFAS; replacement of the Hyannisport and Simmons Pond drinking water wells and pump stations; construction of a new Straightway water treatment facility; demolition of existing facilities; and associated site improvements. A specific sequence of construction is required to maintain the existing level of treatment at the Straightway Facility throughout construction. Refer to Specification Section 01810 for additional information. B. Furnish all labor, materials, equipment, and incidentals to construct the new structure around existing GAC contactors as indicated on the Drawings and specified herein. C. Furnish all labor, materials, equipment, and incidentals to replace the Simmons Pond and Hyannisport wells, pumps and pump stations as indicated on the Drawings and specified herein. D. Furnish all labor, materials, equipment, and incidentals to construct the proposed Straightway Water Treatment Facility as indicated on the Drawings and specified herein. E. Furnish all labor, materials, equipment, and incidentals to modify the existing Booster Pump Station as indicated on the Drawings and specified herein. F. Furnish all labor, materials, equipment, and incidentals for the site improvements indicated on the Drawings including, but not limited to, stormwater management, regrading and paving. G. Furnish all labor, materials, equipment, and incidentals for demolition of the existing Simmons Pond Pump Station, the existing Hyannisport Pump Station, and selective demolition within the existing Straightway Facility, existing Chlorine Shed, and existing Booster Station. Virtual Public Filed Sub Bidder Opening Virtual via Zoom https://townofbarnstable-us.zoom.us/j/85981733640 May 7th 2025, 12:00 PM EDT
Bid Results
Water / Sewer
$34,929,362.00
Public - City
New Construction, Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2025
July 22, 2025
47 Old Yarmouth Rd, Barnstable, MA
Related To This Project
Barnstable, MA
Bid Date: May 07 2025
Barnstable, MA
Bid Date: Apr 02 2025
Barnstable, MA
Bid Date: May 07 2025
Barnstable, MA
Bid Date: May 07 2025
Barnstable, MA
Bid Date: Apr 17 2025
Straightway Water Treatment Facility Project - Miscellaneous and Ornamental Iron - Sub bid - 5744001
Barnstable, MA
Bid Date: May 07 2025
Barnstable, MA
Bid Date: May 07 2025
Barnstable, MA
Bid Date: May 07 2025
Barnstable, MA
Bid Date: May 07 2025
Barnstable, MA
Bid Date: Apr 10 2025
Barnstable, MA
Bid Date: Oct 21 2024
Barnstable, MA
Bid Date: Apr 15 2025
Barnstable, MA
Bid Date: Apr 10 2025
Barnstable, MA
Bid Date: Sep 03 2025
Barnstable, MA
Bid Date: Sep 03 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
