Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 6, 2025 at 8:00 PM
Updated August 7, 2025
Renovation of a transportation facility in Dallas, Texas. Completed plans call for the renovation of a transportation facility.
The Work of this Contract includes the removal and disposal of existing millwork and carpet along with the installation of new millwork cabinetry for breakrooms, offices and back-ofhouse locations throughout the Arrivals and Concourse Levels within Terminal D. Construction will be inside the Airport's Air Operations Area (AOA) and the Customs and Border Protection (CBP) areas at Terminal D. The Contractor shall be responsible for reviewing all existing conditions associated with the work prior to commencement of work activities. The project also involves replacing existing finishes, countertops and sinks within the identified breakroom, office, and back-of-house areas. These new installations will feature modern, high-quality materials that not only enhance the visual appeal of the spaces but also improve usability and hygiene standards. As part of the upgrades, all associated plumbing fixtures in the breakrooms, offices and identified countertops will be replaced. This includes installing new faucets, drains, and any other necessary plumbing components to ensure the areas are fully functional and compliant with current DFW standards. Lastly, the work includes renovation of the existing luggage storage lockers near baggage claim D30. The existing lockers will have their doors removed, discarded, and replaced with new doors to match existing and their interiors refurbished. This will be a Lump Sum contract. Minority/Women Business Enterprise (M/WBE) GOAL: 10% Construction Services. Total Contract Duration 240 calendar days (Substantial Completion of 180 days with an additional 60 consecutive calendar days for Final Completion). To enhance the opportunity for a successful RFB submission, the Airport highly encourages a representative from your company that will complete bidding documents including MWBE forms and submittals for the bid, proposal or statement of qualifications to attend all pre-bid, pre-proposal or pre-qualification statement meetings. Cone of Silence - To ensure a proper and fair evaluation, the DFW International Airport has established a cone of silence applicable to all Competitive Selection Processes, including RFQs, RFPs and RFBs. The cone of silence is designed to protect the integrity of the procurement process by shielding it from undue influences. The cone of silence will be imposed on all Competitive Selection Processes beginning with advertisement for the same and ending with the Board's selection for RFQs, RFPs or the Board's award for a RFB. The Cone of Silence begins when the solicitation is advertised/released and ends after the contract/purchase order is awarded, noting that release of some information is restricted by law. Potential bidders/proposers shall not discuss any aspect of a released solicitation with Airport personnel with exception to the contract administrator/ buyer listed in the solicitation. Question Deadline 04/22/2025 at 4:00 PM CT Online Portal Intent to Bid Due Date: May 27th 2025, 2:00 PM Intent to Bid Due Date: Jun 3rd 2025, 2:00 PM CDT
Award
Transportation Terminals
$1,190,200.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2025
July 4, 2025
2400 Aviation Dr, Dallas, TX
Related To This Project
Dallas, TX
Bid Date: Apr 22 2025
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Apr 18 2025
Dallas, TX
Bid Date: Apr 18 2025
Dallas, TX
Bid Date: Apr 18 2025
Dallas, TX
Bid Date: May 09 2025
Dallas, TX
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
