Published April 21, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a transportation facility in Dallas, Texas. Completed plans call for the renovation of a transportation facility.

The Work of this Contract includes the removal and disposal of existing millwork and carpet along with the installation of new millwork cabinetry for breakrooms, offices and back-ofhouse locations throughout the Arrivals and Concourse Levels within Terminal D. Construction will be inside the Airport's Air Operations Area (AOA) and the Customs and Border Protection (CBP) areas at Terminal D. The Contractor shall be responsible for reviewing all existing conditions associated with the work prior to commencement of work activities. The project also involves replacing existing finishes, countertops and sinks within the identified breakroom, office, and back-of-house areas. These new installations will feature modern, high-quality materials that not only enhance the visual appeal of the spaces but also improve usability and hygiene standards. As part of the upgrades, all associated plumbing fixtures in the breakrooms, offices and identified countertops will be replaced. This includes installing new faucets, drains, and any other necessary plumbing components to ensure the areas are fully functional and compliant with current DFW standards. Lastly, the work includes renovation of the existing luggage storage lockers near baggage claim D30. The existing lockers will have their doors removed, discarded, and replaced with new doors to match existing and their interiors refurbished. This will be a Lump Sum contract. Minority/Women Business Enterprise (M/WBE) GOAL: 10% Construction Services. Total Contract Duration 240 calendar days (Substantial Completion of 180 days with an additional 60 consecutive calendar days for Final Completion). Intent to Bid Due Date: May 13th 2025, 2:00 PM CDT To enhance the opportunity for a successful RFB submission, the Airport highly encourages a representative from your company that will complete bidding documents including MWBE forms and submittals for the bid, proposal or statement of qualifications to attend all pre-bid, pre-proposal or pre-qualification statement meetings. Cone of Silence - To ensure a proper and fair evaluation, the DFW International Airport has established a cone of silence applicable to all Competitive Selection Processes, including RFQs, RFPs and RFBs. The cone of silence is designed to protect the integrity of the procurement process by shielding it from undue influences. The cone of silence will be imposed on all Competitive Selection Processes beginning with advertisement for the same and ending with the Board's selection for RFQs, RFPs or the Board's award for a RFB. The Cone of Silence begins when the solicitation is advertised/released and ends after the contract/purchase order is awarded, noting that release of some information is restricted by law. Potential bidders/proposers shall not discuss any aspect of a released solicitation with Airport personnel with exception to the contract administrator/ buyer listed in the solicitation. Question Deadline 04/22/2025 at 4:00 PM CT Online Portal

GC Bidding

Transportation Terminals

$1,992,485.00

Public - Federal

Renovation

104

24

4

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Construction Facilities, First Aid Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Haul Routes, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Extra Stock Materials, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Resilient Base and Accessories, Terrazzo Flooring, Carpeting, Tile Carpeting, Wall Finishes, Special Wall Surfacing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Lockers, Other Specialties, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment, Printers, Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Specialty Casework, Laboratory Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Cable Services, Pathways for Communications Systems, Identification for Communications Systems, Data Communications, Data Communications Peripheral Data Equipment, Printers
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Fill, Trenching and Backfilling, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
90
Bidding Soon
3,350
All Active Projects
1,256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

July 14, 2025

img_map_placeholder

2400 Aviation Dr, Dallas, TX

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Terminal D Architectural Finishes and Carpet Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.