BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated May 31, 2025

Renovation of a transportation facility in Farmington, Utah. Completed plans call for the renovation of a transportation facility.

The Utah Transit Authority ("UTA") is issuing this RFQP for the development of approximately 7.93 acres at the Farmington FrontRunner Station site located at 450 North 850 West, Farmington, Utah (the "Property"). The purpose of this policy is to establish the minimum safety and security guidelines for contractors of and visitors to UTA construction projects. And to promote consistency of purpose, compliance, and conduct on all UTA construction projects, regardless of size or cost. Utah Occupational Safety and Health (UOSH) requires that UTA inform all contactors regarding the safety rules of UTA. UOSH also requires that contract employees are trained in the work practices necessary to safely perform their jobs. Safety and security must be an integral part of each job. Full participation, cooperation, and support are necessary and required to ensure the safety and health of all persons and property involved in the project. Each Contractor is responsible to provide safe working conditions for their employees and Subcontractors, and to protect the public and all others who may come in contact with, or be exposed to, the project. Contractors must adopt this plan or exceed it with one of their own creation. In the event that a contractor decides to adopt this safety plan, the adoption of this CSSP as the contractor's safety plan will be formalized in writing and signed by the Contractor. A Health and Safety Plan (HASP) is required if there is a risk of chemical contamination on the site. Good partnering with other contractors on project sites is required to minimize the potential for exposure from external sources. Contractors are required to: a. Plan and execute all work in order to prevent personal injury, property damage, and loss work time. b. Comply with federal, state, and local laws, ordinances, codes, regulations, and industry standards, along with UTA's protocols and procedures Project Start Date Approximately Q3 2025 Question Deadline 04/11/2025 at 2:00 PM MT Questions and requests for clarification of any part of this RFQP MUST be submitted via Bonfire only

Post-Bid

Transportation Terminals

$670,000.00

Public - State/Provincial

Renovation

96

12

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
79
Bidding Soon
1,035
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

July 29, 2025

Project location map

450 N 850 W, Farmington, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.