BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2025 at 8:00 PM

Updated October 14, 2025

Site work and paving for a mixed-use development in Normal, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project consists of approximately 3218 square yards (SY) of pavement removal and replacement, 1824 square feet (SF) of PCC sidewalk removal and replacement, geotechnical fabric, driveway pavement, curb and gutter removal and replacement, and detectable warnings, along with all necessary items and incidentals required to complete the project according to the plans and specifications. A location map is shown on the cover of the Plans. The Town of Normal reserves the right to reject any or all bids received. The bid award will be made by the Town Council and their decision will be final. Anticipated Award Date: April 21, 2025

Award

Roads / Highways

$938,740.00

Public - City

Paving, Site Work

35

6

5

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
71
Bidding Soon
1,188
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

May 9, 2025

Project location map

Chippewa St, Normal, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.