BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2025 at 8:00 PM

Updated May 31, 2025

Renovation of a museum in Smithfield, North Carolina. Completed plans call for the renovation of a museum.

Questions are to be emailed no later than 5:00pm on Friday April 11, 2025 to laurie@maurerarchitecture.com. Questions are to be emailed no later than 5:00pm on Friday April 25, 2025 to laurie@maurerarchitecture.com. Alternates: Alternate 1: Apply Stone Strengthener, Prosoco Conservare Oh100 Consolidation Treatment Or Approved Equal Alternate 2: Remove Existing Attic Insulation; Clean. New Batt Insulation With Insulation Baffles At Attic, Typ. Alternate 3: New Half Round Aluminum Gutter And Downspout Alternate 4: Area Of Original Window Infill; Hpo Staff To Provide Field Verification Of Framing During Construction To Determine Whether The Openings Are Original, And Sash May Be Reinstalled: New Double Hung Wood Window; 6/9 Lite Tme. New Sash And Interior/exterior Trim To Match Existing Alternate 5: Room 103/107 Storage & 104 Toilet; New Sheet Vinyl Flooring Alternate 6: 15 Year System- See Section 07 56 00 - Liquid-applied Roofing Warranty Alternate 7: New Aluminum Storm Window, Velva-lume Or Approved Equal. See Specifications On Sheet A3.1 Windows & Doors Alternate 8: Run Existing Condensate Line Behind Chimney Over Window Head Towards Southwest Corner Of Building Terminating At Base Of Corner Board +/- 1" Below Bottom Edge Of Bottom Row Of Siding Alternate 9: Remove Foam Insulation Around Fireplace Trim; Seal Perimeter And Repaint. See P.04-p.05/a1.1 Alternate 10: Area Of Water Intrusion; Repair Interior Gwb In Storage Room 103 And Replace Exterior Roof Flashing This Area. See Img W.04/a2.3 Alternate 11: Paint Building Interior To Include Windows, Walls, Molding, Trim And Ceilings, See Finish Schedule On Sheet A3.1. Repair Plaster Damage; See P.02-p.03/a1.1, P.06/a1.2 Alternate 12: See E1.1 & E2.1 For Add Alternate Electrical Scope Of Work. All Proposed Electrical Work Is By Add Alternate. Alternate 13: Structural Repair Detail 5/s1 Is Add Alternate Repair Detail. Consideration will be given to such matters as contractor integrity, compliance with public policy, record of past performance, financial and technical resources, and Historically Underutilized Business (HUB) status The project is generally described as follows: Repairs to existing two-story historic building, to include new elastomeric roof coating on existing metal roof and new concrete handicap ramp. Exterior repairs include painting the building exterior, windows and trim. Interior repairs include painting walls, ceilings and plaster repair work. Electrical work includes replacement of existing lighting, switches and outlets with new exit and emergency lighting.

Post-Bid

Museum

$250,000.00

Public - City

Renovation

21

3

8

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
126
Bidding Soon
1,571
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

June 30, 2025

Project location map

200 S Front St, Smithfield, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.