BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2025 at 8:00 PM

Updated May 21, 2025

Renovation of a water / sewer project in North Charleston, South Carolina. Completed plans call for the renovation of a water / sewer project.

Replace the existing roof covering on the Sludge Thickener Building at the Felix C. Davis Wastewater Treatment Plant. The goal is to remove and replace the existing mineral surfaced roll (MRS) roof covering and roof insulation with a new Thermoplastic Polyolefin Roof (TPO) over new roof insulation. The existing roof drains and cast iron conductor piping and insulation will be removed and replaced with new cast irons piping and insulation. # of Bid Copies: 1 Question Deadline 04/14/2025 at 10:00 AM ET purchasing@ncsd.sc.gov

Award

Water / Sewer

$318,653.00

Public - City

Renovation

12

20

12

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
2
Bidding Soon
511
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 2, 2025

Project location map

1000 Herbert St, North Charleston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.