Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 26, 2025 at 8:00 PM
Updated June 30, 2025
Renovation of an educational facility in Pasadena, Texas. Completed plans call for the renovation of a educational facility.
https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025019705 Project Name: 2022 BOND CTE WELDING LAB IMPROVEMENTS AT PASADENA HIGH SCHOOL Project Number: TABS2025019705 Facility Name: PASADENA HIGH SCHOOL Location Address: 206 SHAVER ST. Pasadena, TX 77506 Location County: Harris Start Date: 6/6/2025 Completion Date: 8/31/2025 Estimated Cost: $405,000 Type of Work: Renovation/Alteration Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: Revise the existing welding shop at Pasadena High School to accommodate existing and additional equipment and increase ventilation to the space. Square Footage: 2,500 ft 2 ------------------------------------------------------------------------------------- 2022 Bond CTE Welding Lab Improvements at Pasadena High School. Question Deadline 05/06/2025 at 2:00 PM CT All questions concerning the Proposal shall be directed to the Pasadena ISD online ebid system Project Budget: $629,168.00 HVAC CONTRACTORS SCOPE OF WORK 1. As a part of this contract, the HVAC Contractor shall make any changes in the sheaves, belts, dampers, valves, pump impellers, etc. required for correct balance as required by the TAB firm, at no additional cost to the Owner. 2. The HVAC Contractor shall provide and coordinate services of qualified, responsible subcontractors, suppliers and personnel as required to correct, repair or replace any and all deficient items or conditions found during the testing, adjusting and balancing period. 3. In order that all systems may be properly tested, balanced and adjusted as required by these Specifications, the contractor shall operate the systems at his expense for the length of time necessary to properly verify their completion including final adjustments, balancing and readiness for Owners TAB firm. This length of time shall be acceptable to the Inspector. Contractor shall provide all devices to verify correctness of operation. 4. Contract completion schedules shall provide sufficient time to permit the completion of TAB firms services prior to Owner occupancy. 5. The Drawings and Specifications have indicated valves, dampers and miscellaneous adjusting devices for the purpose of adjustment to obtain optimum operating conditions, and it shall be the responsibility of the contractor to install these devices in a manner that will leave them adjusted, accessible and readily adjustable. Should any such device not be readily accessible, the contractor shall provide access as requested by the TAB firm. Any malfunction encountered by TAB personnel and reported to the contractor or to the inspector shall be corrected by the contractor immediately so the balancing work can proceed. 6. The scope of the TAB work as defined herein is indicated in order that the contractor will be appraised of the coordination, adjustment and system modification which will be required under the project work in order to complete the Owners requirements for final TAB. The TAB firm will not have a contractual relationship with this contractor but will be responsible to the Inspector and Owner for the satisfactory execution of the TAB work. The contractor shall allow sufficient funds in the project cost estimate and bid proposal to provide all work which may be required in the TAB phases as defined herein and as may be necessary for the completion of the TAB work as defined by the TAB firm.
Post-Bid
Educational
$629,168.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2025
June 12, 2025
206 Pasadena Fwy Frontage Rd, Pasadena, TX
Related To This Project
Pasadena, TX
--
Pasadena, TX
Bid Date: May 06 2025
Pasadena, TX
--
Pasadena, TX
Bid Date: Jun 23 2025
Pasadena, TX
Bid Date: May 21 2025
Pasadena, TX
Bid Date: Jun 11 2025
Pasadena, TX
--
Pasadena, TX
--
Pasadena, TX
--
Pasadena, TX
Bid Date: Apr 16 2025
Pasadena, TX
--
Pasadena, TX
--
Pasadena, TX
Bid Date: Apr 07 2025
Pasadena, TX
Bid Date: Apr 09 2025
Pasadena, TX
Bid Date: Mar 26 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
