Published July 7, 2025 at 8:00 PM

Updated August 7, 2025

Site work and paving for a mixed-use development in Ray, North Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work generally consists of: 1. Schedule 1: Water Main Extensions a. Base Bid: Open-cut installation of approximately 340 LF of 6-inch water main and 3,635 LF of 8-inch water main including valves, hydrants, fittings, and other associated appurtenances. Horizontal directionally drilled installation of approximately 105 LF of 8-inch water main. Jack and Bored installation of approximately 280 LF of 8-inch water main and 16-inch casing. Surface restoration will include aggregate and grass surfacing. 2. Schedule 2: Sanitary Sewer CIPP Rehabilitation a. Base Bid: Trenchless cured-in-place-pipe (CIPP) rehabilitation of approximately 2,977 LF of 8-inch sanitary sewer main, approximately 46 internally CIPP-sealed service lateral connections, CIPP rehabilitation of approximately 30 existing service laterals from the main to the property line, and installation of 2 sanitary sewer manholes. Open-cut replacement of existing sanitary sewer mains/laterals will be included as necessary. Surface restoration will include asphalt pavement, curb and gutter, and landscaping. b. Qualifications: To demonstrate the Bidder's qualifications to perform the Work, within five (5) calendar days of the OWNER's request, Bidder shall submit written evidence of previous experience in performing municipal trenchless sewer main and sewer service renovation using Cured-In-Place-Pipe methods, previous experience in performing horizontal directionally drilled water mains, and previous experience in performing jack and bore pipe/casing installations. Contract Time: 1. Schedule 1: a. Construction Schedule 1 must be substantially complete and ready for Owner's use and pre-final inspection within ninety (90) calendar days of the date issued in the Notice to Proceed of Schedule 1. Notice to Proceed to be issued no later than 30 days after the fully executed Construction Agreement. 2. Schedule 2: a. Construction Schedule 2 must be substantially complete and ready for Owner's use and pre-final inspection within ninety (90) calendar days of the date issued in the Notice to Proceed of Schedule. 2. Notice to Proceed to be issued no later than 30 days after the fully executed Construction Agreement. 3. Each construction schedule shall be finally complete and ready for final payment within thirty (30) calendar days of substantial completion. 4. The Contractor shall pay the Owner $1,700.00 for each day or part of a day that expires after the time specified for Substantial Completion of any construction schedule until the Work is substantially complete. The maximum amount the Contractor will pay is $1,700.00 per calendar day regardless of the number of construction schedules or alternates that are not substantially complete per the time described above. Question Deadline 04/18/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than five (5) days prior to the date for opening of Bids may not be answered.

Award

Water / Sewer

$2,170,023.00

Public - City

Paving, Site Work

35

22

2

8

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
3
Bidding Soon
70
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

Project location map

Multiple Locations, Ray, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.