BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2025 at 8:00 PM

Updated December 11, 2025

Site work, paving and outdoor lighting for a transportation facility in Morristown, Vermont. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and for outdoor lighting for a transportation facility.

The Contractor is hereby notified that there are statewide program DBE goals. The Agency has an overall participation goal of 2.6%. Goalsfor minority participation for each trade: 0.08% Goals for female participation in each trade: 6.9% Location: Town of Morristown County of Lamoille Morrisville-stowe State Airport (Mvl) Type of Construction: Construct, Mark, Light, and Sign Parallel Taxiway Extension (Approx. 1000 Ft X 35 Ft) Contract Completion Date: This Contract Shall Be Completed Within 135 Days on or Before October 15, 2026. Bid Bond: Electronic Bid Bond to Be Submitted in the Amount of 5% of the Contractor's Bid. Engineer's Estimate: for This Proposal the Engineer's Estimate is Category E: $2,500,000 - $5,000,000 During the Advertisement Period, All Questions Shall Be Addressed Solely to the Office of Contract Administration via Email: Aot.constructioncontractinginquiry@vermont.gov. All Inquiries Must Be Received by 4:30pm on Wednesday, April 16, 2025. All Bidders on This Project Must Hold Both Current Annual Prequalification With the Vermont Agency of Transportation Through the "Contractor's Experience Questionnaire and Financial Statement" and Unconditioned Project-specific Approval Through the "Standard Form - Request for Proposal" Ca-82 Form. The Right is Reserved to Reject Any or All Bids, to Waive Any Formality, and Any and All Technicalities in Bids, and to Accept Such Bids as May Be Deemed in the Best Interest of the Awarding Agency *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. VTDOT: Morristown AV-FY22-003

Award

Transportation Terminals

$13,062,337.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

61

10

9

9

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
168
Bidding Soon
2,294
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2025

June 24, 2025

Project location map

2305 Laporte Rd, Morristown, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.