BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Site work and paving for a sidewalk / parking lot in Sharon Springs, Kansas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

SCOPE: Kansas Department of Transportation is seeking competitive bids for Mill and Overlay at the Sharon Springs Subarea. This Project consist of repaving the Sharon Spring Subarea parking lot owned by the Kansas Department of Transportation at 528 N Clark St Sharon Springs, KS 67758. This will be divided into 3" Paving, 2" Paving/1" Transition Milling and 4" Paving/4" Milling. All work for this project shall be performed in a professional and workmanlike manner and be in accordance with the 2015 Kansas Department of Transportation Specifications and latest special provisions active on the date the project is awarded. This is a LUMP SUM project. No price adjustments will be made for asphalt 1. All Prices are per unit and payments will be based upon the actual number or units performed at that price. 2. Mobilization is considered subsidiary to the line items 3. Bond will not be included 4. Surveying, staking, QC testing, grading, removals, traffic control, utilizes location and adjustment or relocation are not included. 5. Mill and inlay 4 inches of existing asphalt pavement and rock base for an estimated surface area of 56,513 square feet at the Sharon Springs Subarea office located at 528 N Clark St, Sharon Springs, Ks. Place 2 lifts of 2 inches on top of surface. Transition 1"mill around all concrete and pave 2" for an estimated surface area of 55,732 square feet. Pave 3" of HMA on Existing surface for a surface area of7,766 square feet. HMA will be commercial grade asphalt according to the Kansas Department of Transportation 2015 Standard Specifications (Some locations may require more asphalt to tie in to new concrete pavement as well as variable milling to lower grade around salt shed etc to create a smooth transition). 6. Millings to be retained by KDOT and hauled by the contractor to a site approximately 1 mile north from the KDOT yard on highway K-27. 7. Work to be completed before November 15, 2026. Overlay will need to begin within two days after the milling operation. Question Deadline 04/24/2025 Questions requesting clarification of the bid must be submitted in writing to the Procurement Officer Ashley Evans 785-296-8107 ashley.n.evans@ks.gov

Bid Results

Sidewalks / Parking Lot

$326,961.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
3
Bidding Soon
54
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 2, 2025

Project location map

528 Clark St, Sharon Springs, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.