Published May 22, 2025 at 8:00 PM
Updated May 23, 2025
Site work and paving for a transportation facility in Foss, Oklahoma. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
Counties: Washita This project includes a portion of Taxiway A and the north portion of the Main Apron. Calendar Days: 315 Days Rehabilitate Airfield Pavements - Phase 2 Rehabilitate Airfield Pavements at Clinton Sherman Airport Near Burns Flat. Project Length = 0.00 Miles The Dbe Goal is Zero for This Proposal Unless otherwise specified in the proposal, all bids must be submitted with a proposal guaranty equal to 5 % of the bid total. 0010 ODOT-414 16" Concrete Pavement 7,000 S.Y. 0020 P-101-004 Concrete Pavement Removal 7,000 S.Y. 0030 S-502-001 Spall Repair 390 C.F. 0040 P-605-002 Joint Sealant 91,000 L.F. 0050 P-101-030 Pavement Marking Removal 22,420 S.F. 0060 P-620-015 Reflectorized Pavement Marking 12,420 S.F. 0070 P-620-016 Non-Reflectorized Pavement Marking 16,190 S.F. 0080 P-620-020 Reflectorized Taxiway Closure Marking 2 EA. 0090 TEMP-001 Temporary Marking, Lighting, and Barricades 1 L.S. 0100 C-100-001 Contractor Quality Control Program (CQCP) 1 L.S. 0110 C-105-001 Mobilization (NTE 10% of Total Bid Amount) 1 L.S. OKDOT - 030 - Rehabilitate Airfield Pavements - Phase 2 A Pre-Bid Video Teleconference: 10:00 AM CDT on Thursday, April 17, 2025 Video and Audio Microsoft Teams App or Web Browser Access at the following Link: https://teams.microsoft.com/l/meetupjoin/19%3ameeting_Y2EzYmVhMDQtZmJhYi00MzlmLWEzNTAtYTk1NDY2ZGIyNGEy%40thr ead.v2/0context=%7b%22Tid%22%3a%22f4702691-11cc-4dae-8e40- d1d25281504f%22%2c%22Oid%22%3a%220babdb14-dc88-417e-9b42-7f8c99875c3d%22%7d Question Deadline 04/24/2025 Questions concerning the Plans and Specifications for this project should be directed to the Office Engineer Division at ODOTPrebid.Question@odot.org SCOPE OF WORK 3-19 General Provisions AC 150/5370-10H 40-04 Extra work. Should acceptable completion ofthe contract require the Contractor to perform an item ofwork not provided for in the awarded contract as previously modified by change order or supplemental agreement, Owner may issue a Change Order to cover the necessary extra work. Change orders for extra work shall contain agreed unit prices for performing the change order work in accordance with the requirements specified in the order, and shall contain any adjustment to the contract time that, in the RPR’s opinion, is necessary for completion ofthe extra work. When determined by the RPR to be in the Owner’s best interest, the RPR may order the Contractor to proceed with extra work as provided in Section 90, paragraph 90-05, PaymentforExtra Work. Extra work that is necessary for acceptable completion ofthe project, but is not within the general scope ofthe work covered by the original contract shall be covered by a supplemental agreement as defined in Section 10, paragraph 10-59, SupplementalAgreement. 40-01 Intent of contract. The intent ofthe contract is to provide for construction and completion, in every detail, ofthe work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms ofthe contract. 40-02 Alteration ofwork and quantities. The Owner reserves the right to make such changes in quantities and work as may be necessary or desirable to complete, in a satisfactory manner, the original intended work. Unless otherwise specified in the Contract, the Owner’s Engineer or RPR shall be and is hereby authorized to make, in writing, such in-scope alterations in the work and variation ofquantities as may be necessary to complete the work, provided such action does not represent a significant change in the character ofthe work. For purpose ofthis section, a significant change in character ofwork means: any change that is outside the current contract scope ofwork; any change (increase or decrease) in the total contract cost by more than 25%; or any change in the total cost of a major contract item by more than 25%. Work alterations and quantity variances that do not meet the definition ofsignificant change in character ofwork shall not invalidate the contract nor release the surety. Contractor agrees to accept payment for such work alterations and quantity variances in accordance with Section 90, paragraph 90-03, CompensationforAltered Quantities. Should the value of altered work or quantity variance meet the criteria for significant change in character ofwork, such altered work and quantity variance shall be covered by a supplemental agreement. Supplemental agreements shall also require consent ofthe Contractor’s surety and separate performance and payment bonds. Ifthe Owner and the Contractor are unable to agree on a unit adjustment for any contract item that requires a supplemental agreement, the Owner reserves the right to terminate the contract with respect to the item and make other arrangements for its completion. 40-03 Omitted items. The Owner, the Owner’s Engineer or the RPR may provide written notice to the Contractor to omit from the work any contract item that does not meet the definition ofmajor contract item. Major contract items may be omitted by a supplemental agreement. Such omission of contract items shall not invalidate any other contract provision or requirement. Should a contract item be omitted or otherwise ordered to be non-performed, the Contractor shall be paid for all work performed toward completion ofsuch item prior to the date ofthe order to omit such item. Payment for work performed shall be in accordance with Section 90, paragraph 90-04, Paymentfor OmittedI tems
Bid Results
Transportation Terminals
$2,797,085.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2025
June 16, 2025
2nd St, Foss, OK
Related To This Project
Foss, OK
Bid Date: Jul 24 2025
Foss, OK
Bid Date: Nov 20 2024
Foss, OK
Bid Date: Nov 20 2024
Foss, OK
Bid Date: Aug 22 2024
Foss, OK
Bid Date: May 07 2024
Foss, OK
Bid Date: Apr 18 2024
Foss, OK
Bid Date: Feb 09 2023
Foss, OK
Bid Date: Sep 01 2022
Oklahoma City, OK
Bid Date: Apr 23 2025
Norman, OK
Bid Date: Sep 09 2025
Locust Grove, OK
Bid Date: Apr 28 2025
Tulsa, OK
Bid Date: Apr 16 2025
Norman, OK
Bid Date: Apr 03 2025
Coweta, OK
Bid Date: Aug 07 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.