BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 7, 2025 at 8:00 PM

Updated May 8, 2025

Site work for a water / sewer project in Santa Paula, California. Completed plans call for site work for a water / sewer project.

Reference Number 0000382414 This is a Public Works project which consists of improvements at the existing Canyon Booster Pump Station site including, but not limited to: demolition of existing retaining wall, demolition of electrical equipment, pump assembly - motor, pump, can, removal and replacement of piping, new vertical turbine pumps and cans, valves, electrical improvements, CIDH piles and retaining wall, thrust blocks, miscellaneous water improvements, pressure testing, flushing and disinfection, bacteriological testing, installation of asphalt paving, and other incidental and appurtenant work necessary for the proper construction of the contemplated improvement, as indicated on the project plans. Question Deadline 04/23/2025 at 4:00 PM PT Questions are submitted online No All questions relating to interpretation of the Contract Documents must be submitted in writing and responses shall be in the form of written addenda to the Contract Documents. Questions may be sent via electronic mail to the attention of the Interim City Engineer Robert Woodwad, PE, engineer@spcity.org Questions submitted after this time shall not be responded to. Contract time for completion of the Work shown in the Bidding Documents is 120 Working Days. Once the work is started, it must be continuously performed until completion. Liquidated Damages Liquidated damages for avoidable delays shall be $500.00 per consecutive day in excess of the Contract Time for the completion of the Work. - Performance Bond 100 % - Labor and Materials Bond 100 % The Successful Bidder will be required to furnish a Performance Bond in the amount of one hundred percent (100%) of the Total Bid Price, and a Payment (Material and Labor) Bond in the amount of one hundred percent (100%) of the Total Bid Price, on the forms provided and, in the manner, described in the Bid Documents. The Bid Bond will be forfeited should the bidder to whom the Contract is awarded fail to enter into the Contract and provide the required Performance and Payment Bonds and Certificate(s) of Insurance within ten (10) calendar days after the date of receipt of Notice of Award of the Contract pursuant to the terms of said Bid Bond. General Requirements - Certified Payroll - Contractors License Required - Insurance Required - License Required - Onsite Maintenance Required - Prevailing Wage Required The City of Santa Paula is accepting sealed bids by US Postal Service (mailed) or similar service (FedEx, UPS, etc.), or by hand delivery. All sealed bids shall be mailed/delivered to the City Clerk’s office, 970 Ventura St., Santa Paula, California 93060, by 1:30 P.M. on: MONDAY, MAY 5, 2025

Post-Bid

Water / Sewer

$700,000.00

Public - City

Site Work

7

21

18

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
434
Active Projects
198
Bidding Soon
2,359
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

June 4, 2025

Project location map

866 E Main St, Santa Paula, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.