Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 2, 2025 at 8:00 PM
Updated May 3, 2025
Site work and new construction of a pre-engineered storage facility in Little Rock, Arkansas. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
Construction of Maintenance Field Crew Building Job 42-109 FOB: Little Rock, AR Location(s) 11302 Baseline Rd, Little Rock, Arkansas, 72209 Allows zero unit prices and labor Yes Allows negative unit prices and labor Yes For questions about Bidding requirements contact Danny Keene (501-569-2674). For questions about job specifications contact Sherman Whittle (501-569-2154). Q&A Deadline 04/24/2025 04:00 PM EDT Bid Bond in the amount of 5% of total bid price is required of all bidders at time of bid opening or bid will be rejected. Personal and company checks are not acceptable as Bid Bonds. See Condition 4 on page 1 of Standard Bid Conditions. Bid bonds that are not submitted electronically must be physically received by Equipment & Procurement located at 11302 West Baseline Road, Little Rock, AR 72209 prior to the designated time of the bid opening. Bid Invitation number should be clearly displayed on the sealed envelope or package.Performance Bond only (no checks of any kind allowed) in the amount of 100% will be required of successful bidder prior to providing goods/services.See Condition 4 on page 1 of Standard Bid Conditions. Surety Bonds may be submitted electronically through the online bidding process. If submitting a Surety Bond that is not compatible with Surety 2000 and Tinubu, your company still may do so. Other Surety Companies will still be accepted but must be received in Equipment and Procurement before the time of bid opening at 11302 West Baseline Road, Little Rock, AR 72209 prior to the designated time of the bid opening. This includes Cashier's checks, Certified checks, or Money orders submitted as bid bonds must be physically received by Equipment & Procurement. On site work will not commence until all requested materials have been acquired and accumulated for inspection by ARDOT. All work must be completed within 240 calendar days of commencement of work. ARDOT - Construction of Maintenance Field Crew Building
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$300,000.00
Public - State/Provincial
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2025
May 29, 2025
11302 Baseline Rd, Little Rock, AR
Related To This Project
Little Rock, AR
Bid Date: Sep 17 2025
Little Rock, AR
--
Little Rock, AR
Bid Date: Apr 21 2025
Little Rock, AR
Bid Date: Apr 22 2025
Little Rock, AR
Bid Date: May 05 2025
Little Rock, AR
Bid Date: Apr 23 2025
Little Rock, AR
Bid Date: Apr 17 2025
Little Rock, AR
Bid Date: Apr 29 2025
Little Rock, AR
Bid Date: Apr 09 2025
Little Rock, AR
Bid Date: Apr 15 2025
Little Rock, AR
Bid Date: Apr 15 2025
Little Rock, AR
Bid Date: Apr 04 2025
Little Rock, AR
Bid Date: Apr 17 2025
Little Rock, AR
Bid Date: Apr 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
