BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work and paving for a mixed-use development in Isanti, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of June 13, 2025, the project was awarded to Pember Companies, Inc., with an awarded amount of $621,136.15.** Question Deadline 04/22/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. 681 Lf 10" Watermain (Directionally Drilled) 188 Lf 10" Watermain (Open Cut) 3 Ea 10" Gate Valve & Box 1 Ea 6"Gate Valve & Box 1 Ea 10.5 Bury Hydrant 550 Lb Ductile Iron Fitting 340 Sq Yd Bituminous Patch (Roadway) 135 Sq Yd Bituminous Patch (Driveway) 25 Sq Yd Concrete Pavement 12" 35 Sq Yd 6" Concrete Pavement 220 Cu Yd Excavation - Common 150 Cu Yd Aggregate Base Cl 5

Award

Water / Sewer

$621,136.00

Public - City

Paving, Site Work

24

21

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
130
Bidding Soon
1,448
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 29, 2025

Project location map

To Be Determined, Isanti, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.