BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2025 at 8:00 PM

Updated April 22, 2025

Site work and paving for a sidewalk / parking lot in Lincoln, Nebraska. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Indian Hills and Crown Pointe Sidewalk Repair Indian Hills Sidewalk Repair Various Locations Southeast Lincoln Project No. 706533 (LTU - Eng. Services) Bid No. 25-087 Crown Pointe Sidewalk Repair Various Locations -Southeast Lincoln Project No. 706534 (LTU Eng. Services) Bid No. 25-088. Questions concerning this bid process may be directed to City/County Purchasing at (402) 441-8103 or purchasing@lincoln.ne.gov. Question Cuttoff Date & Time 4/9/2025 03:00:00 PM (ET) This contract is primarily focused upon the reconstruction of sidewalk and curb ramps. There is an immediate need for repair of sidewalks at the locations as shown on the plans. The Contractor shall coordinate the Beginning of Work date with the Project Manager. Once Work commences, it is expected that the Contractor remain on site until the completion of the project. This project includes sidewalk and curb ramp reconstruction in various locations in southeast Lincoln. The plan set indicates locations ofsidewalk repairs needed and are approximate and subject to change. The Contractor shall coordinate with the Project Manager regarding upcoming repair locations. The City will mark the actual sections of sidewalk and ramps which require repair upon receiving notification from the Contractor a minimum of seven days in advance of anticipated construction. The Contractor shall be required to complete all repair work and site clean-up at any given location within seven working days ofinitial removals at that location. The Work will involve removal and reconstruction of curb and sidewalk according to Lincoln Standard Plan No. 600 for sidewalk ramp construction. The City's Project Manager will determine with the Contractor the specific type of ramp construction at each location. Sidewalk and curb ramps must be poured back within three (3) working days after removal, unless granted additional time by the Project Manager. Curb ramps on opposing corners of intersections must be phased unless the Project Manager approves removal of multiple corners. The Contractor shall minimize their construction area so that disruption to pedestrians and existing vegetation and/or landscaping in the park space area will be held to a minimum. The Contractor will be responsible to backfill disturbed areas with suitable topsoil in accordance with City specifications. Concrete rubble and construction debris placed within public rightof-way must be removed prior to the completion of the Contractor's activities on a daily basis. Any rubble and debris allowed to remain in the public right-of-way for greater than 24 hours may be removed by the City at the Contractor's expense.

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

5

6

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
84
Bidding Soon
861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2025

May 5, 2025

Project location map

Multiple Locations, Lincoln, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.