BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Site work for a water / sewer project in Rosenberg, Texas. Completed plans call for site work for a water / sewer project.

The deadline to ask questions is 4/25/2025 2:00 PM CST Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online Project consists of installation of water distribution, sanitary collection, and storm sewer system to serve Indigo Section Two, Phase B as outlined in the bid set construction plans. Contractor hereby agrees to achieve Final Completion of the Work within 75 calendar days after the date of the written Notice to Proceed. SCOPE OF WORK: a. Contractor shall commence and complete the Work generally described as follows: Proposed Water Distribution, Wastewater Collection, and Storm Water Facilities to Serve Indigo Section Two, Phase B for FORT BEND COUNTY MUNICIPAL UTILITY DISTRICT NO. 251, Fort Bend County, Texas, according to those particular Plans and Technical Specifications prepared by Odyssey Engineering Group, LLC ("Engineer") and all Extra Work in connection therewith, under the terms as stated in the Contract, and, at Contractor's own proper cost and expense, to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said Work, in accordance with the conditions and prices stated in the Bid attached hereto and in accordance with the Contract Documents, including, the Invitation to Bidders, Instructions to Bidders, Contractor's Bid, the Contract, Plans, and other drawings and printed or written explanatory matter thereof, and the Technical Specifications, on file with Engineer. Contractor represents and warrants to the Owner that it has carefully examined this Contract and all other Contract Documents, which are made a part of the Contract, and is thoroughly familiar therewith. b. Under this Contract and the Contract Documents, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in the Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. c. The Work, in general, under the Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. d. Major items of construction and services required are designated as follows: i. Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances ii. Construct and adjust sanitary sewer, manholes, and appurtenances iii. Construction and adjust storm sewer, manholes, inlets and appurtenances.(4) Upon completion of the paving portion of the project (by others) furnish and install all second stage items as necessary to complete the project iv. Perform testing as specified on installed lines v. Clean-up project area upon completion

Bid Results

Water / Sewer

$1,095,368.00

Public - County

Site Work

89

17

6

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
4
Bidding Soon
2,092
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 30, 2025

Project location map

To Be Determined, Rosenberg, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.