BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 24, 2025

Site work and renovation of a water / sewer project in Lincolnshire, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of April 25, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. The proposed project consists of the rehabilitation of the Northampton Lift Station. The project includes wet well work, pump replacement, electrical work, pipe work, concrete, and other miscellaneous objectives. Bid Bond 5% DESCRIPTION OF WORK A. General The Work to be performed generally consists of furnishing labor, materials, equipment, and supervision as required by the Contract Documents for furnishing, installing, testing and placing into operation the Northampton Lift Station Improvements including related accessory equipment. The types of Work to be performed include but are not limited to the following: 1. Furnish and install (2) wastewater pumps in existing concrete wet well. 2. Furnish and install precast concrete flat top slab with access hatch on existing concrete wet well. 3. Furnish and install ductile iron discharge piping, fittings, valves in existing concrete valve vault. 4. Furnish and install precast concrete flat top slab with access hatch on existing concrete valve vault. 5. Furnish and install pump control panel and SCADA system within pump control panel enclosure. 6. Provide bypass pumping during construction. 7. Coordinate electric service. 8. Demolition of existing lift station equipment and pump control panel. 9. Furnish and install sidewalk and site/landscaping restoration. 1.02 LOCATION OF THE WORK The Northampton Lift Station Improvements work site is located on the west side of Northampton Lane between 207 and 208 Northampton Lane in the Village of Lincolnshire, Illinois.PHYSICAL CONDITIONS The site on which the lift station is located has limited access and boundary constraints, all of which the Contractor accepts full responsibility. Any staging area(s) required by the Contractor shall be the responsibility of the Contractor. 1.04 ACCESS TO JOB SITE Access to the project site is possible from Northampton Lane.

Award

Water / Sewer

$429,000.00

Public - City

Renovation, Site Work

24

15

2

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
520
Active Projects
293
Bidding Soon
3,673
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

Project location map

Northampton Ln, Lincolnshire, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.