Published October 23, 2025 at 8:00 PM

Updated October 24, 2025

Site work and renovation of a mixed-use development in San Francisco, California. Completed plans call for the renovation of a educational facility; for site work for a playground / park / athletic field; and water / sewer project.

As of October 23, 2025, the project is under construction. A general contractor has been selected. Construction is expected to finish on February 2, 2025. *The closed solicitation has been included below for reference: Description of Phase 1 - Submittals and Mobilization The work includes, but is not limited to: o Mobilization and Preliminary Layout: The contractor shall mobilize construction facilities including temporary fencing, construction trailers, temporary utilities, and sanitary facilities. For the purposes of developing shop drawings or layout, the contractor may take measurements at the site during nonschool hours. o NO contractor parking allowed onsite at any time during school year. o Submittals: Contractor shall provide all submittals within the timeframes listed in Section 01 33 00 - Submittal Procedures. Contractor shall pay special attention to long-lead items and deferred submittal items. o Procurement: Contractor shall proceed to procure materials and equipment that are long lead items upon Architect's approval of applicable submittal. Description of Phase 2 - Site Improvements The work includes, but is not limited to: o Demolition of AC paving & base, where indicated. Installation of underground utility lines, base, AC paving. Description of Phase 3 - Site Improvements The work includes, but is not limited to: o Demolition at track and field; AC paving & base, where indicated. Installation of underground infrastructure, rough and fine grading, permeable turf sports field, track, concrete curb around filed, Hazardous material abatement where occurs per Hazardous Materials Specifications report in Appendix A, including eight (8) eight-hours shifts for all exterior hazardous material removal. Description of Phase 4 - Site Improvements and Equipment The work includes, but is not limited to: o Demolition: AC paving & base, concrete, where indicated, concrete foundations, fencing, gates, and footings; basketball standards, hoops and supports where indicated (PIP three standards; bollards and footings; landscaping. Hazardous material abatement where occurs per Hazardous Materials Specifications report in Appendix A, including eight (8) eight-hours shifts for all exterior hazardous material removal. o Installation: underground infrastructure, rough and fine grading, AC Paving, track striping, concrete and pavers, basketball standards, and striping, playground structures, outdoor learning areas. Description of Phase 5 - Site Improvements and Landscape The work includes, but is not limited to: o Irrigation infrastructure o Bioretention planters o Raised planters o Concrete benches, and tables o Amphitheater o Tree and landscape planting Description of Phase 6 - Sitework, Landscape, and Equipment The work includes, but is not limited to: o Demolition of tress and planters, concrete wall and footings, benches, underground utilities, and site preparation. o Irrigation infrastructure o Raised planters o 1,000 gal cistern and pad o Concrete curved walls, stairs, benches and tables o Amphitheater o Courtyard theater o Gymnasium courtyard o Main garden at the front of school o Pavers o Tree and landscape planting Question Deadline: 04/18/2025 For Questions regarding obtaining Bid Documents contact: Prop A Bond Program Contracts Office, San Francisco Unified School District 135 Van Ness Avenue, Room 208 San Francisco, CA 94102 Tel: 415.241.6152 ext. 1528 Contact: Ruth Simon Email: Simonr@sfusd.edu

Under Construction

Playgrounds / Parks / Athletic Fields

$4,500,000.00

Public - City

Renovation, Site Work

64

29

7

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
494
Active Projects
202
Bidding Soon
2,902
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

June 25, 2025

Project location map

45 Conkling St, San Francisco, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.