BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 1, 2025 at 8:00 PM

Updated July 2, 2025

Site work for a water / sewer project in Del Monte Forest, California. Completed plans call for site work for a water / sewer project.

**As of July 1,2025, this project has not yet been awarded. A timeline for the award has not yet been established.** ** As of May 19,2025, this project has not yet been awarded. A timeline for award has not yet been established.** CONTRACT TIME: The Contract Time for Final Completion of all the Work is established at two hundred and forty (240) consecutive calendar days beginning with the date of the Notification to Proceed (NTP from the Owner. The contractor (System Integrator) is required to fabricate and deliver electric motor control panels, SCADA control panels, and furnish miscellaneous control and instrumentation equipment per attached Specifications (Exhibit D) and Drawings (Exhibit E). System Integrator is to accommodate multiple field mobilizations per Exhibit A-2. Field installation and programming shall be performed by others. An overview of related Scope of Work is presented below: 1.1 Motor Control (MC) Panels: o Submit shop drawings for review and approval o Fabricate panels per approved submittals o Perform factory testing o Ship and deliver panels to the PBCSD office o Perform on-site start-up and commissioning of panels 1.2 SCADA Control Panel: o Submit shop drawings for review and approval o Fabricate panels per approved submittals o Perform factory testing o Ship and deliver panels to the PBCSD office o Perform on-site start-up and commissioning of panels 1.3 Power Monitoring/ Flygt MAS Panel: o Submit shop drawings for review and approval o Fabricate panels per approved submittals o Perform factory testing o Ship and deliver panels to the PBCSD office o Perform on-site start-up and commissioning of panels 1.4 Miscellaneous Motor Control Equipment o Submit shop drawings, submittals for, and furnish miscellaneous control equipment as identified in in Drawings (Exhibit E) and Specifications (Exhibit D). o Ship & deliver miscellaneous control equipment to the PBCSD office o Perform on-site start-up and testing of controls 1.5 Instrumentation o Furnish instrumentation as identified in in Drawings (Exhibit E) and Specifications (Exhibit D), and furnish mounting supports or accessories as recommended by manufacturer. See Instrumentation Index (Exhibit D) for list of required instrumentation. o Ship & deliver instrumentation to the PBCSD office o Perform on-site start-up, calibration and testing of instruments

Bid Results

Water / Sewer

$319,139.00

Public - City

Site Work

48

7

6

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
2
Bidding Soon
521
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 5, 2025

Project location map

To Be Determined, Del Monte Forest, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.